VNENSign in
Posted date: 22-Apr-2026 4:18:18 PM VN
Some new points of the:

Circular No. 13/2026/TT-BKHCN - New regulations on announcement and application of standards

on replacing of:
  • Circular No. 11/2021/TT-BKHCN⛔ - Rules for application of international standards in Vietnam
Effective date: 24-May-2026
What's new
These are completely new regulations only in Circular No. 13/2026/TT-BKHCN that are not mentioned in Circular No. 11/2021/TT-BKHCN:
• Definition of "Adjustment and supplementation of plans" : The new Circular provides an official definition for this activity, clarifying the change of contents, withdrawal from or addition of new TCVN compared to the approved plan (Article 3, Clause 1 ).
• Evaluation of the effectiveness of the application of TCVN : The new Circular supplements detailed regulations on the review and especially "evaluation of the effectiveness of the application of TCVN" periodically (after 03 years) or earlier when necessary. This regulation emphasizes the consideration of the actual impact of the TCVN after its promulgation, as a basis for amendment, replacement or annulment (Article 12 ).
• Publicity of TCVN funded by the state budget : An important new point is the mandatory regulation "The National Committee for Standards, Metrology and Quality publicly posts TCVNs funded from the state budget" and TCVN is cited in technical regulations on the National Database. This promotes transparency and accessibility of TCVN to the public (Article 17 Paragraph 2 ).
• Principles of intellectual property when applying standards : The new Circular supplements the principle that the law on intellectual property and copyright must be complied with when applying TCVN based on international, regional and foreign standards (Article 19, Clause 2, Point d ) and when directly applying these standards (Article 20, Clause 2, Point dd ).
• Notification of announcement of TCCS to the National Database : The regulation requires establishments to be responsible for notifying the publication of their basic standards (TCCS) through the National Database on Standards, Metrology and Quality within 20 days from the date of announcement. This is a great step forward in the management and publicity of the TCCS system nationwide (Article 22 Clause 3 ).
• Separate regulations for TCCS of associations and associations used for certification : The new Circular dedicates a separate article (Article 25 ) to detail the development of TCCS of associations and associations when this standard is used for certification activities. The requirements include the establishment of a compilation team to ensure independence, objectivity and transparency and must be consulted by the line ministries and the National Standards Agency.
• Transitional provisions for announced TCCS : The new Circular has transitional provisions, requiring TCCS that were announced before the effective date of this Circular to make a notice of publication through the National Database before December 31, 2026 (Article 27 Clause 2 ).

Changes
These are the regulations in both Circulars but have been amended and supplemented in Circular No. 13/2026/TT-BKHCN.
| Spotlight | Old (Circular No. 11/2021/TT-BKHCN) | New (Circular No. 13/2026/TT-BKHCN) |
| :--- | :--- | :--- |
| Focal Point | The focal point of the Ministry of Science and Technology is the Directorate for Standards, Metrology and Quality ( Article 4, Clause 1, Point a). | The focal point of the Ministry of Science and Technology is the National Committee for Standards, Metrology and Quality (e.g. Article 5 Clause 1 Point a ). |
| Deadline for notification of TCVN construction plan | - 5-year plan: Notification within 30 days from the date of approval (Article 4, Clause 2, Point c ).
• Annual plan: Notification within 15 days from the date of approval (Article 4, Clause 3, Point c ). | Both the 5-year plan and the annual plan shall be notified within 10 days from the date the plan is approved (Article 5 Clause 3 Point b and Article 7 Clause 3 Point b ). The time is shortened and unified. |
| Time limit for completing the draft TCVN after appraisal | Ministries and ministerial-level agencies have a time limit of 120 days to complete the draft TCVN after the notification of appraisal results (Article 5, Clause 1, Point d4 ). | The time limit for finalizing the draft TCVN after the notification of appraisal results is shortened to 90 days (Article 8, Clause 2, Point c ). |
| Procedure for building TCVN | Combine the order and procedures for the development of TCVN by ministries and branches; at the request of organizations and individuals; and organized by the Ministry of Science and Technology in the same article (Article 5 ). | Clearly separating the order and procedures for building TCVN into separate articles:
• Article 8 : Formulated by ministries, ministerial-level agencies and agencies attached to the Government.

• Article 9 : Proposed by organizations and individuals.

• Article 10 : The Ministry of Science and Technology shall be formulated.

This makes the text structure logical and easier to look up. |
| Order and procedures for building TCCS | List 9 detailed and somewhat rigid steps: planning, compiling, collecting opinions, organizing conferences, processing opinions, making dossiers, verifying, publishing, printing (Article 14 Clause 1 ). | Regulation of the order is more flexible, focusing on the core steps: research, compilation, collection of opinions (if necessary), processing of opinions and finalization, verification and publication. At the same time, it allows establishments to build their own detailed processes suitable to their scale (Article 22 ). |
| TCVN symbol | There are very detailed regulations on how to express the TCVN symbol, especially in the case of acceptance of international standards (e.g. TCVN ISO 22301:2018 (ISO 22301:2012)) and how to present it on the cover (Article 8 ). | The regulations are simpler, only stating the symbolism, presentation and expression of the contents of the TCVN shall comply with the provisions of TCVN 1-2:2025 (Article 15 Clause 1 ). This helps the Circular to be more compact and flexible when the TCVN guides changes. |
| Transitional provisions for TCVN construction project | Projects under the approved plan, ending in 2020, continue to comply with the old Circulars (Article 19 ). | Projects under the 2025 plan that have been developed and appraised but have not yet been announced will continue to comply with Circular No. 11/2021/TT-BKHCN (Article 27, Clause 1 ). |

Removal points
These are the concepts or regulations contained in Circular No. 11/2021/TT-BKHCN but have been completely eliminated and are no longer mentioned in Circular No. 13/2026/TT-BKHCN.
• Detailed definitions of standards : Circular No. 13/2026/TT-BKHCN has removed a series of detailed definitions already contained in Article 3 of Circular No. 11/2021/TT-BKHCN , including:
• National standards (TCVN).
• National standard field.
• Accept international, regional and foreign standards into TCVN.
• International standard.
• Regional standards.
• Foreign standard.
• Grassroots standards (TCCS).
The reason may be that these concepts have been clearly stipulated in higher Laws or Decrees, repetition at the Circular level is not necessary.
• Methods of application of TCVN and international standards : Circular No. 11/2021/TT-BKHCN clearly classifies two methods of application as "direct application" and "indirect application" for both TCVN (Article 10 Clause 1 ) and international, regional and foreign standards (Article 11 Clause 2 ). Circular No. 13/2026/TT-BKHCN no longer maintains this classification but goes directly to the principles and measures to promote its application.
• Specific responsibilities of the parties : Circular No. 11/2021/TT-BKHCN devotes a whole chapter (Chapter V) to regulating "Implementation organization", which clearly states the responsibilities of the Ministry of Science and Technology (Article 15 ), ministries, ministerial-level agencies (Article 16 ), and organizations and individuals participating in the development of TCVN (Article 17 ). Circular No. 13/2026/TT-BKHCN does not have provisions stipulating these individual responsibilities, instead there is only a general article on "Implementation Responsibilities" (Article 28 ), possibly because these responsibilities have been stipulated in higher-level documents.

ai-luatvietnam-icon-24 Change analysis

Found 644 posts Export list to Excel