VNENSign in
Posted date: 13-Oct-2025 4:41:05 PM VN
Some new points of the:

Circular No. 47/2024/TT-BTNMT - New regulations on saltwater intrusion monitoring and survey techniques

on replacing of:
  • Circular No. 39/2016/TT-BTNMT⛔ - Monitoring and investigation techniques for saltwater intrusion survey
Effective date: 14-Feb-2025
What's new
The following regulations are completely new and only mentioned in Circular No. 47/2024/TT-BTNMT, not in Circular No. 39/2016/TT-BTNMT:
More detailed explanation of terminology: Circular 47/2024 supplements explanations of Average salinity of the water, Salinity cycle (salinity), Salinity foot (salinity), Salinity peak (peak salinity), Average salinity of salinity, Salinity monitoring station or point, Full hour, Delegate Duty Water, Salinity Process Line, Automatic Salinity Monitoring, Salinity Boundary Article 3*. These concepts help to apply and understand the provisions of the circular more accurately.
• Elements of direct measurement or information collection (Article 4.2): Circular 47/2024 specifies the collection of information on the location and characteristics of river sections (river bed erosion, discharge sources on both sides of the river), and the situation of saltwater intrusion in previous years.
• Detailed regulations on measuring equipment (Article 5.1): Circular 47/2024 sets out the minimum requirements for the measurement range and accuracy of devices for measuring salinity, depth, temperature and GPS positioning.
• Detailed regulations on manual salinity monitoring (Article 6): Circular 47/2024 more clearly stipulates the monitoring location (between the flow or delegate waterways) and the number of measuring layers (3 floors or 1 floor depending on the depth).
• Detailed regulations on monitoring or collecting hydrometeorological factors (Article 9): Circular 47/2024 specifically refers to national technical regulations on hydrological and meteorological monitoring to measure water level and rainfall.
• Detailed regulations on adjustment of monitoring data (Article 10): Circular 47/2024 specifies the formulation of typical salinity charts along rivers and drawing related relationship lines (salinity - water level, salinity between stations).
• Detailed regulations on automatic salinity monitoring (Section III): This is a completely new content, detailing automatic salinity monitoring stations, monitoring elements, monitoring positions, construction solutions, monitoring regimes, equipment, technical characteristics, station operation, etc transmit and receive data and calculate and make data tables.
• Detailed regulations on saltwater intrusion investigation and survey (Section IV): Circular 47/2024 details the principles for determining observation points, survey contents, surveys, and monitoring in surveys, surveys, and calculations and data adjustments.
• Specific regulations on quality assessment and archiving of documents (Article 20): Circular 47/2024 refers to specific circulars on assessment of document quality and archiving of observation documents.
• Regulations on reports, data on monitoring and investigation and survey (Article 21): Circular 47/2024 specifies the types of data to be reported, the composition of the document set, the report form and the reporting regime.
• Transitional regulations (Article 23): Referring to the fact that organizations and individuals that have been approved for salinity monitoring and saltwater intrusion investigation and survey programs before the effective date of this Circular shall comply with Circular No. 39/2016/TT-BTNMT.
Changes
The following table summarizes the main changes in Circular No. 47/2024/TT-BTNMT compared to Circular No. 39/2016/TT-BTNMT:
SpotlightOld (Circular 39/2016/TT-BTNMT)New (Circular 47/2024/TT-BTNMT)
Applicable ObjectsApplicable to the National Hydrometeorological System and organizations and individuals involved in saltwater intrusion monitoring and survey activities.Applicable to the national network of hydrometeorological stations engaged in saltwater monitoring and saltwater intrusion investigation and survey. Article 2
Salinity Meter AccuracySalinity meter: ensure the accuracy of 0.1‰. Article 6.1aSalinity: ensure the minimum requirements as follows: measurement range 0 ÷ 50‰; accuracy ±0.5‰. Article 5.1a
Depth Gauge AccuracyDepth gauge: guaranteed accuracy of 1 cm. Article 6.1bDepth: ensure the minimum requirements as follows: measuring interval 0.3 ÷ 5m; Accuracy ±0.01m. Article 5.1b
GPS Locator AccuracyGPS locator: ensure accuracy ± 3 m of ground. Article 6.1cCoordinate positioning (GPS): ensure minimum accuracy within 1 ÷ 5m of the ground. Article 5.1d
Northern Monitoring TimeStarting in December last year and ending in May next year. Article 7.2a1The monitoring period conducted in 6 months of the dry season is specified in Section 1, Appendix 1 to this Circular. Article 7.1
Central Monitoring TimeFrom Quang Binh to Quang Ngai starting from March and ending in August of the year; From Binh Dinh to Binh Thuan starts in February and ends in July of the year. Article 7.2a2The monitoring period conducted in 6 months of the dry season is specified in Section 1, Appendix 1 to this Circular. Article 7.1
Southern Monitoring TimeIt starts in January and ends in June of the year. Article 7.2a3The monitoring period conducted in 6 months of the dry season is specified in Section 1, Appendix 1 to this Circular. Article 7.1
Monitoring ModeThere are 4 measurement modes (hourly measurement, odd hour measurement, salinity peak foot measurement, 3 consecutive days measurement). Article 7.2cThe salinity monitoring regime shall be applied appropriately depending on the extent and development of saltwater intrusion in each area across the country. The salinity monitoring regime is specified in Section 2, Appendix 1 to this Circular. Article 7.3
Salinity Measurement MethodSalinity measurement after sampling: using the AgNO3 Silver Nitrate method. Article 8.2b3Salinity measurement after sampling is carried out using a measuring device or by the Mo method (the Mo method is only applied in the absence of a salinity measuring device). Article 8.2b
Northern Measurement Point DistanceFor rivers in the Northern region, the distance between the measurement points is between 5 ÷ 7 km. Article 13.1aFor rivers in the Northern region, the distance between monitoring points is between 5 ÷ 7 km. Article 16.1a
Central Measurement Point DistanceFor rivers in the Central region, the distance between measurement points is from 3 ÷ 5km. Article 13.1bFor rivers in the Central region, the distance between monitoring points is between 3 ÷ 5 km. Article 16.1b
Southern Measurement Point DistanceFor rivers in the Southern region, the distance between the measurement points is from 10 ÷ 15km. Article 13.1cFor rivers in the southern region, the distance between monitoring points is between 10 ÷ 15km. Article 16.1c
ResponsibilityThe General Director of the National Center for Hydrometeorology shall guide its affiliated units in organizing the implementation of this Circular. Article 17.1 The Director of the Department of Meteorology, Hydrology and Climate Change shall monitor and inspect the implementation of this Circular. Article 17.2The General Director of the General Department of Hydrometeorology shall disseminate and inspect the implementation of this Circular. Article 24.1
Removal points
The following concepts or regulations are contained in Circular No. 39/2016/TT-BTNMT but are not mentioned at all in Circular No. 47/2024/TT-BTNMT, indicating that the new Circular no longer provides for this issue:
• Regulations on occupational safety in monitoring and survey (Article 4): Circular 39/2016 provides general regulations on the full implementation of current regulations on occupational safety. Circular 47/2024 does not directly mention occupational safety, although this is still an implicit and important requirement in all monitoring and survey activities.
• Specific requirements on human resources for survey investigation (Articles 14.2d, 14.5): Circular 39/2016 stipulates the assurance of adequate human resources and assignment of specific tasks in the process of survey investigation. Circular 47/2024 does not have specific regulations on this issue, although the reasonable arrangement of human resources is still an important factor to ensure the quality of work.
• Monthly salinity measurement report (Article 11.1a): Circular 39/2016 stipulates that salinity measurement points must make monthly reports on the measurement situation and send them to the management unit. Circular 47/2024 only stipulates the monthly operation report for each monitoring station/point (manual and automatic); investigation and survey routes and monitoring summary reports in batches or years for units managing monitoring and investigation and survey.
Note:
*This analysis is based on the content provided and may not include all detailed differences.
• The interpretation and application of regulations should be carried out by qualified legal and technical professionals.

ai-luatvietnam-icon-24 Change analysis

Found 644 posts Export list to Excel