Guidelines on determination of cost per shift of construction machinery
This Circular provides guidelines on determination of cost per shift of construction machinery and equipment (referred to as “machinery cost per shift”) serving as the basis for preparation and management of construction expenditure.
Notably, machinery cost per shift determined under this Circular only includes the entire or some of the expenses namely depreciation, costs of repair, fuel, power, operators and other expenses; not include cost of construction of cover structures for machinery, machinery foundation, electricity, water and compressed gas supply systems.
This Circular takes effect from February 1th, 2020.
- Please be informed that Annex No. 2 is neither translated nor included in the English file.
- See more the amendments, supplements at Circular No. 02/2020/TT-BXD⛔ dated July 20th, 2020.
- This Circular shall be expired from October 15th, 2021, replaced by Circular No. 11/2021/TT-BXD⛔ dated August 31st, 2021.