Posted date: 25-Nov-2025 7:33:06 PM VN
Some amends and supplements of the

Circular No. 09/2025/TT-BCT⚠️ - Method of determining the electricity generation price bracket and electricity import price bracket from February 1, 2025

within:
  • Circular No. 54/2025/TT-BCT - Amendments to regulations on electricity generation price framework and electricity generation price calculation method
  • Circular No. 25/2025/TT-BCT - Supplementing regulations on building a power generation price bracket for wind power and solar power
  • Effected from: 21-Nov-2025
    Below is a detailed analysis of the amendments and supplements of Circulars 25/2025/TT-BCT and 54/2025/TT-BCT to Circular 09/2025/TT-BCT, focusing on the contents related to the original Circular.
    ### New additions
    ◦ Circular 25/2025/TT-BCT:
    ◦ Article 1: Add clauses 7 and 8 to Article 3 of Circular 09/2025/TT-BCT, detailing the development of a power generation price framework for wind power by region and sea area, as well as the basis for determining regions for solar power and onshore wind power.
    ◦ Circular 54/2025/TT-BCT:
    ◦ Article 1.1: Add point c to Clause 1, Article 1 of Circular 09/2025/TT-BCT, expanding the scope of regulation to include small renewable energy power plants whose avoided cost price schedule expires, power plants whose power purchase or BOT contracts expire.
    ◦ Article 1.4: Add clause 7 after clause 6, Article 2 of Circular 09/2025/TT-BCT, defining "Flexible power plant".
    ◦ Article 1.8: Add Article 8a after Article 8 of Circular 09/2025/TT-BCT, regulating the method of determining the electricity generation price framework for types of "other power plants" such as small-capacity coal-fired thermal power plants, coal-fired thermal power plants using state capital, coal-fired thermal power plants borrowing domestic currency capital, and small renewable power plants that have lost their price incentives.
    ### Changes
    FocusOld (Circular 09/2025/TT-BCT)New (Amended Circular)
    Scope of application (Article 1.2.a)Exclusion of "independently invested energy storage battery systems"Addition of exclusion of "independently invested energy storage battery systems"
    Definition of pumped storage hydropower plant (Article 2.3)"A pumped storage hydropower plant is a hydropower plant that uses a water storage system at different elevations to store energy and generate electricity, in which water is pumped from a low-elevation water storage area to a higher-elevation water storage area during non-generation times to store energy.""A pumped storage hydropower plant is a hydropower plant that uses a water storage system at different elevations to store hydropower and generate electricity, in which water is pumped from a low-elevation water storage area to a higher-elevation water storage area during non-generation times to store hydropower and discharge it through a turbine to generate electricity when the power system needs it." Replace "energy" with "hydropower"
    Formula for calculating investment cost (Article 5.2)Original formula, definition of components (DF, re, rd, tax rate T)Modified formula (In terms of mathematical notation).
    Formula for calculating financial discount rate (Article 5.5)Original formula, definition of components (DF, re, rd, tax rate T)Modified formula (In terms of mathematical notation).
    Loan interest calculation formula (Article 5.5.a)Original formula, definition of components (DF, rd,F, DD, rd,D)Modified formula (In terms of mathematical notation).
    Dossier for approval of electricity generation price framework (Article 12.1.b)"Parameter table and documents for calculating electricity generation price framework as prescribed in Articles 4, 5, 6, 7 and 8 of this Circular;""Parameter table and documents for calculating electricity generation price framework as prescribed in Articles 4, 5, 6, 7, 8 and Article 8a of this Circular;" (Add Article 8a)
    Circular 54/2025/TT-BCT (Article 2) amends and supplements a number of articles of Circular No. 12/2025/TT-BCT:
    ◦ Article 2.1: Amending and supplementing Clause 3, Article 1 of Circular No. 12/2025/TT-BCT, adding the following non-applicable subjects: "Pumped storage hydropower plants; independently invested energy storage battery systems; power plants applying the electricity purchase price mechanism in documents of competent authorities."
    ◦ Article 2.2: Add clause 16 after clause 15, Article 2 of Circular No. 12/2025/TT-BCT, defining "P50 Expectation Level".
    ◦ Article 2.3: Amending and supplementing points b and c, Clause 2, Article 5 of Circular No. 12/2025/TT-BCT, related to the economic life of power plants and the method of calculating average electricity generation over many years.
    ◦ Article 2.4: Amending and supplementing Clause 2, Article 10 of Circular No. 12/2025/TT-BCT, related to determining the average annual delivered electricity and total project investment.
    ◦ Article 2.5: Supplement Clause 3, Article 22 of Circular No. 12/2025/TT-BCT, related to the construction of major repair cost ratios, other costs and labor costs for types of power plants that have not been regulated.
    ◦ Article 2.6: Amend the title of Table 2 in Appendix I of Circular No. 12/2025/TT-BCT, related to the ratio of operation and maintenance costs of solar and wind power plants.
    ### Repealed or expired
    There is no information about repeal or expiration in the "Amendments" provided.
    ### Overview of the impact of the difference
    ◦ Circular 25/2025/TT-BCT focuses on clarifying regulations on wind power price frameworks by region and area, in order to create more favorable conditions for the development of this type of energy.
    ◦ Circular 54/2025/TT-BCT has a broader scope of regulation, adding regulations related to flexible power plants, other power plants (such as small-capacity coal-fired thermal power plants or those using state capital), as well as adjusting definitions and calculation formulas. This addition helps the electricity generation price framework become more flexible and suitable for many different types of power plants, while solving problems arising in actual implementation.
    ◦ The amendment and supplementation of calculation formulas in Article 5 (Circular 54/2025/TT-BCT) may affect the calculation results of the electricity generation price framework, thereby affecting the revenue and profits of power plants.
    ◦ Clarifying the definition and scope of application (e.g. pumped storage hydropower plants, energy storage battery systems) helps avoid disputes and misunderstandings during implementation.
    ◦ Adding regulations on "other power plants" (Article 8a - Circular 54/2025/TT-BCT) can create more favorable conditions for these plants to participate in the electricity market, especially plants whose incentives or BOT contracts have expired.
    ◦ Amendments and supplements to Circular No. 12/2025/TT-BCT (related to the method of determining electricity generation service prices and electricity purchase contracts) also have an indirect impact on the electricity generation price framework, as this price framework is the basis for negotiating electricity prices in electricity purchase contracts.

    ai-luatvietnam-icon-24 Change analysis