VNENSign in
Posted date: 14-Oct-2025 10:05:14 AM VN
Limits and regulations must know within the

Decree No. 258/2025/NĐ-CP - New regulations on management of parks, trees and water surfaces

Effective date: 09-Oct-2025
Limitations
• Do not plant dangerous trees: Do not plant new thorny trees, fruit trees that are likely to fall off, causing danger in street space (Article 29.1). If it has been planted, it is necessary to take measures to warn, protect and plan to cut down, move and replace.
• Business area in the park: The land area of the park for business purposes is not more than 15% of the total land area of the park and less than 5 hectares (Article 5.3a).
• Limitation of interference with lakes: The cultivation and exploitation of aquaculture in lakes must be controlled in order to ensure the balance of the ecosystem environment, not pollute water sources and not change the function of regulating lake water (Article 17.2).
• Do not affect the park: Do not affect the existing works in the park when constructing underground works. If it is necessary to arrange a part of the premises of the park to serve the construction work, measures must be taken to minimize the impact of the project on the park and the plan to return the ground and assets of the park (Article 18.2b).
• No entrance fee: Do not collect entrance fees from park users and have a plan to remove or remove hard fences in investment in new construction, upgrading and renovation of parks (Article 11.3a).
• License term: The term of the permit for felling and moving trees is 30 days from the date of issuance of the permit; after 30 days from the date of issuance of the permit, if the organization or individual has not yet cut down or relocate, the license must be re-granted (Article 27.7a).
Need to know
• Compliance with planning: Management of parks, trees and water surfaces must comply with approved urban and rural plannings and technical regulations; meet the requirements of management, use and exploitation (Article 4.1).
• There are internal park rules: All parks must have internal rules (Article 11.5). The rules must be publicly posted and clearly in easily accessible areas.
• Ensuring safety and security: Establishing and maintaining a security system, patrol and protection forces to ensure security and safety for park users (Article 11.4a).
• Green trees for public use must meet the criteria: Green trees for public use selected for planting must meet the criteria specified in Clause 2, Article 26 of this Decree; to prioritize the use of indigenous trees and trees with positive impacts on the environment and ecology (Article 22.2).
• Preserving and protecting trees: Green trees must be preserved, protected, cared for, and maintained (Article 22.4).
• Dangerous trees must take measures: Trees that are at risk of causing danger must take measures to warn, protect and have a plan to cut down, move and replace them in a timely manner (Article 22.5).
• Trees to be preserved: Trees to be preserved must make statistics on the number of trees corresponding to the type of trees, assess the quality status of trees, number the trees, hang name plates, arrange protective fences and make management and care records to serve the conservation work as prescribed (Article 25.1).
• Planting trees to ensure the proportion of green land: Construction works must ensure the proportion of green land area according to technical regulations (Article 23.2).
• Notice before felling or relocating trees: Before implementing the felling or relocation of trees, the implementing organization or individual must notify the unit assigned to manage green infrastructure assets and the representative of the self-management organization of the population community where the trees to be cut down are located. to inform the population community (Article 27.7b).

ai-luatvietnam-icon-24 Risk assessment

Found 442 posts Export list to Excel