Some new points of the:
Decree No. 57/2025/NĐ-CP
- New regulations on direct power trading
on replacing of:
- Decree No. 80/2024/NĐ-CP⛔ - It allowable direct electricity trading from July 03, 2024
Effective date: 03-Mar-2025
Below is a detailed analysis of the new points, changes and removals between the two documents of Decree No. 57/2025/ND-CP (Decree 57/2025/ND-CP) and Decree No. 80/2024/ND-CP (Decree 80/2024/ND-CP):
What's New
The following regulations are completely new, only in Decree No. 57/2025/ND-CP (Decree 57/2025/ND-CP):
• Interpretation of the term "rooftop solar power" (Article 3.3): The specific definition of "rooftop solar power" is electricity produced from photovoltaic panels installed on the roof of a construction work.
• Interpretation of terms on Electricity delivered (Article 3.4): It is clearly stipulated that Electricity delivered by the Seller is the entire electricity delivered by the Seller to the Buyer for payment.
• Explanation of the term "Residual Electricity Generation" (Article 3.17): Specific definition of Residual Electricity Output is the part of the electricity output of the renewable energy generating unit that generates electricity into the national grid or the power grid of zone or cluster models when the electricity output is not sold to large electricity users through the separately connected power grid.
• Conditions for participation in the direct electricity purchase and sale mechanism in year N+1 (Article 5.2.b): Specific regulations on conditions for large electricity users to continue to participate in the direct electricity purchase and sale mechanism in the next year, based on actual electricity consumption.
• Detailed regulations on the residual electricity output of rooftop solar power (Articles 6.3 & 6.4): Specific regulations on the residual electricity output of rooftop solar power sold to EVN or electricity retailers at zones and clusters, rate limits and calculation of purchase and sale prices.
• Responsibilities for negotiating the cost of power grid use services of renewable energy generating units investing in and installing rooftop solar power systems that sell electricity directly to large electricity users in zones and clusters shall be responsible for negotiating with electricity retailers in zones and clusters. on the cost of providing services using the power grid within the model of zones and clusters (Article 7.2).
• Regulations on amending existing power purchase contracts of large electricity users in zones and clusters directly from renewable energy generating units (Article 8.2): Clearly stating the responsibilities of customers in amending existing power purchase contracts to ensure the supply of electricity according to demand.
• Allocation of the actual output of the renewable energy generating unit to the large electricity user (at the point of delivery) according to the principles specified in Clause 1, Article 16 of this Decree (Article 20.3).
• Regulations on the unification of the percentage (%) of electricity output allocated by renewable energy generating units to large electricity users according to the principles specified at Point dd, Clause 1, Article 26 of this Decree (Articles 21.5, 24.1).
• New regulations on reviewing and making a list of large electricity users (within the scope of management) who are not eligible to participate in the direct electricity purchase and sale mechanism in year N, to the electricity system and electricity market operator (Article 22.3).
• New regulations on Uniform signing of power purchase contracts with Power Corporations and Power Companies as prescribed in Clause 2, Article 24 of this Decree (Article 23.3.a).
• Supplementing details on the order and dossier of participation in direct electricity purchase and sale through the national grid (Article 26):
◦ Specific requirements on the written agreement in principle signed between the renewable energy generating unit and the large electricity user or the electricity retailer at the authorized zone and cluster models.
◦ Clearly stipulating the responsibilities of the electricity system and electricity market operator, the Electricity Corporation, and the Vietnam Electricity Group in reviewing and certifying the dossier.
◦ Add a step to guide and implement the agreement with the renewable energy generating unit on the percentage (%) of allocated electricity output.
• Regulations on the order and regime of reporting on the form of direct electricity purchase and sale through the private grid (Article 25).
• Detailing cases and procedures for suspending, terminating and reinstating participation in the direct power purchase and sale mechanism (Article 27):
◦ Clearly classify cases of suspension and payment during the suspension period.
◦ Regulations on the competence to decide on the suspension, termination and restoration of participation in the direct electricity purchase and sale mechanism.
Changes
The following provisions have changes between Decree No. 57/2025/ND-CP (Decree 57/2025/ND-CP) and Decree No. 80/2024/ND-CP (Decree 80/2024/ND-CP):
• Article 2.2.b (Decree No. 57/2025/ND-CP) compared to Article 2.2.b (Decree No. 80/2024/ND-CP): The subjects of large electricity users have changed, Decree No. 80/2024/ND-CP stipulates that "Customers using large electricity for production purposes purchase electricity from the Electricity Corporation or electricity retail units other than the Electricity Corporation connected to voltage levels from 22 kV or more", while Decree No. 57/2025/ND-CP stipulates that "Customers using large electricity for production purposes or customers using large electricity for the purpose of providing electric charging services for vehicles using electricity purchase from the Electricity Corporation, Electricity companies and connected electricity retail units with a voltage level of 22 kV or more". => Addition of large electricity users for the purpose of providing electric charging services for electric vehicles.
• Article 3.5 (Decree No. 57/2025/ND-CP) compared to Article 3.6 (Decree No. 80/2024/ND-CP): The definition of "renewable energy generating unit" is adjusted, removing specific details about the type of power source (solar, wind, small hydropower, etc.) and replacing it with "electricity unit owning a renewable energy power plant specified in Clause 14, Article 4 of the Law on Electricity No. 61/2024/QH15". => Change of reference legal basis.
• Article 3.6 (Decree No. 57/2025/ND-CP) compared to Article 3.7 (Decree No. 80/2024/ND-CP): The definition of "Electricity retail units in zone and cluster models" is changed from "200,000 kWh/month or more" to no regulation on electricity purchase output. => Removal of the requirement for minimum purchased electricity output.
• Article 3.7 (Decree No. 57/2025/ND-CP) compared to Article 3.8 (Decree No. 80/2024/ND-CP): The definition of "Electricity system and electricity market operator" is adjusted to update the current name.
• Article 3.9 (Decree No. 80/2024/ND-CP) - Private connection lines are renamed to Private connection power grids in Article 3.11 (Decree No. 57/2025/ND-CP).
• Article 3.10 (Decree No. 80/2024/ND-CP) - Term contracts has been removed and replaced with definitions related to timing(Articles 3.13 to 3.16).
• Article 3.12 (Decree No. 80/2024/ND-CP) - Large electricity users have undergone major changes, the regulations on average consumption of 200,000 kWh/month or more (calculated on average in the last 12 months), calculated according to the registered output of 200,000 kWh/month or more, have been replaced by reference to the regulations of the Minister of Industry and Trade. => Changes in the criteria for determination Customers who use large electricity refer to the regulations of the Ministry of Industry and Trade.
• Article 4.2.b (Decree No. 80/2024/ND-CP) stipulates that "... Large electricity users or electricity retailers in zones and clusters are authorized to sign power purchase and sale contracts with the Electricity Corporation (or authorized/decentralized units) to purchase all electricity to meet demand", while Article 4.2.c (Decree No. 57/2025/ND-CP) has the adjustment of "Large electricity users (or Units) retailing electricity in authorized zones and clusters) to sign power purchase contracts with the Power Corporation and the Power Company to purchase all electricity to meet electricity demand." => Changing regulations, allowing customers to sign power purchase contracts with both the Power Corporation and the Power Company to meet electricity demand
• Article 6.2 (Decree No. 57/2025/ND-CP) only mentions "Residual electricity output", while Article 6.2 (Decree No. 80/2024/ND-CP) details "Renewable energy power generation units negotiate, agree and sign power purchase contracts on capacity, output, and prices for surplus electricity output with the Electricity of Vietnam (or authorized units) in accordance with the determined.". => Abolishing regulations on electricity purchase and sale in terms of capacity, output, and price for residual electricity output
• Article 16.1 (Decree No. 57/2025/ND-CP) and Article 16.2 (Decree No. 80/2024/ND-CP) changes the electricity bill payment structure of customers.
• Article 20.3 (Decree No. 57/2025/ND-CP) and Article 20.4 (Decree No. 57/2025/ND-CP) compared to Article 20.3 (Decree No. 80/2024/ND-CP) and Article 20.4 (Decree No. 80/2024/ND-CP) have changes in the frequency of publication of the list and electricity consumption of large electricity users, Renewable energy generating units from monthly to quarterly.
• Article 23.1 (Decree No. 57/2025/ND-CP) stipulates "Agreement with large electricity users on the cost of providing services using the power grid within the zones and clusters models (from the total electricity purchase meter of the electricity retailer at the authorized zone and cluster models to the electricity retail meter for large electricity users) in accordance with the within 30 days from the date of receipt of the written request and complete enclosed dossier of the large electricity user", meanwhile, Article 23.1 (Decree No. 80/2024/ND-CP) stipulates "Agreement with large electricity users on the retail cost in the industrial park fence, economic zones, export processing zones, industrial clusters, hi-tech parks, concentrated information technology parks, high-tech agricultural zones in accordance with regulations of the Ministry of Industry and Trade within 30 days from the date of receipt of written requests and complete enclosed dossiers of large electricity users.". => Changes in retail costs in the fences of industrial parks, economic zones, etc. into the cost of providing services using the power grid and no longer required in accordance with the regulations of the Ministry of Industry and Trade
• Article 26.3.c (Decree No. 57/2025/ND-CP) stipulates: "Review the responsiveness of the document agreeing on the percentage (%) of electricity output allocated by renewable energy generating units to large electricity users or electricity retailers at authorized zone and cluster models according to the principles specified at Point dd, Clause 1 of this Article", Meanwhile, Article 26.3.c (Decree No. 80/2024/ND-CP) stipulates: "Review the responsiveness of dossiers sent by large electricity users or electricity retailers at authorized zone and cluster models according to the provisions of Point dd, Clause 1 of this Article. In case the actual electricity output of the renewable energy generating units has a term contract with the large electricity user or the electricity retailer at the authorized zone or cluster models that cannot be determined, the electricity system and electricity market operator shall guide the large electricity user or the retailing electricity at authorized zones and clusters to re-agree with renewable energy generating units on the principle of allocation.". => Change the responsibilities of the electricity system operator and the electricity market if there are renewable energy generating units that cannot determine the allocation principle.
• Article 28.2.b (Decree No. 80/2024/ND-CP) stipulates "Report on the implementation and results of the implementation of the mechanism for direct electricity purchase and sale through the national grid nationwide of the preceding quarter", meanwhile, Article 28.2.a (Decree No. 57/2025/ND-CP) stipulates "Report on the results of direct electricity purchase and sale through the national grid in M-1" and Article 28.2.b (Decree No. 57/2025/ND-CP) stipulates "Report on the results of direct power purchase and sale through the National Grid of year N-1". => Change the reporting regime from quarterly to monthly and annual reports.
Removal Points
The following concepts and regulations are contained in Decree No. 80/2024/ND-CP (Decree 80/2024/ND-CP) but are not mentioned at all in Decree No. 57/2025/ND-CP (Decree 57/2025/ND-CP), which can be understood as no longer regulated:
• Specific terms of the contract are allowed to be negotiated and amended (Appendices I, II, III): Decree No. 80/2024/ND-CP stipulates many terms in the Addendum that the parties can negotiate and adjust. Decree No. 57/2025/ND-CP repeals these regulations.
• Explanation of terms about Bidding, Connection Point, Payment Cycle, Forward Contract (Article 3): These definitions are no longer in Decree No. 57/2025/ND-CP.
• The requirement to obtain the National Technical Regulation on electricity safety for large electricity users is in Article 8.2 of Decree No. 80/2024/ND-CP: In Decree No. 57/2025/ND-CP, this requirement is no longer available.
• Contract termination clause: According to the document of the state agency to sign the power purchase contract according to the new regulations. (Article 7.6a, Decree No. 80/2024/ND-CP): Decree No. 57/2025/ND-CP no longer stipulates this provision.
• Responsibility of the Electricity of Vietnam to check the calculation results of the Electricity Corporation on the expected power loss rate in year N (KPP) and announce this rate before November 30, N-1 (Article 19.2): In Decree No. 57/2025/ND-CP, this responsibility has been eliminated.
Important Note:
• The above analysis is based on a direct comparison of the content of the two texts provided. In order to have an absolutely accurate conclusion and properly apply the law, it is necessary to refer to all official documents, guiding documents and opinions of competent agencies.
• This analysis focuses only on key differences in terms of content. There may be minor changes in language or sentence structure that are not mentioned.
Change analysis
Found 644 posts
Export list to Excel
-
Decree No. 319/2026/NĐ-CP - Mandatory roadmap for installing cruise monitoring devices and cameras on vehicles
Effective date:: 01-Jul-2027 -
Law No. 13/2026/QH16 - Law on Prevention and Control of the Proliferation of Weapons of Mass Destruction
Effective date:: 01-Jul-2027 -
Law No. 15/2026/QH16 - Law Amending the Law on State Compensation Liability (2026)
Effective date:: 01-Mar-2027 -
Decree No. 419/2026/NĐ-CP - New penalties in the mineral sector, effective from January 15, 2027
Effective date:: 15-Jan-2027 -
Decree No. 415/2026/NĐ-CP - New penalty levels in the field of science and technology transfer
Effective date:: 05-Jan-2027 -
Decree No. 399/2026/NĐ-CP - The minimum wage from January 1, 2027 will increase by at least 310,000 VND/month
Effective date:: 01-Jan-2027 -
Decree No. 372/2026/NĐ-CP - Regulations on attaching identifiers and product traceability
Effective date:: 01-Jan-2027 -
Decree No. 384/2026/NĐ-CP - Criteria for determining the origin of Vietnam for goods circulated in the country
Effective date:: 01-Jan-2027 -
Decree No. 401/2026/NĐ-CP - Sanctioning levels in the field of digital technology industry (applied from 22/12/2026)
Effective date:: 22-Dec-2026 -
Decree No. 391/2026/NĐ-CP - New fines in the field of betting and prize games, applicable from 5/12/2026
Effective date:: 05-Dec-2026 -
Decree No. 393/2026/NĐ-CP - Conditions for exemption and issuance of work permits for foreigners from 5/12/2026
Effective date:: 05-Dec-2026 -
Circular No. 145/2026/TT-BTC - New regulations on clearing and settlement of securities transactions
Effective date:: 16-Nov-2026 -
Decree No. 379/2026/NĐ-CP - Renewal of standards and norms for the use of public cars
Effective date:: 16-Nov-2026 -
Decree No. 374/2026/NĐ-CP - Regulations on bidding within the framework of free trade agreements
Effective date:: 14-Nov-2026 -
Decree No. 363/2026/NĐ-CP - Penalties for violations in the field of data
Effective date:: 11-Nov-2026 -
Decree No. 385/2026/NĐ-CP - New regulations on control of administrative procedures
Effective date:: 10-Oct-2026 -
Decree No. 328/2026/NĐ-CP - Regulations on measures to prevent and handle fake news
Effective date:: 05-Oct-2026 -
Decree No. 316/2026/NĐ-CP - Amendments to the financial regime for state-owned banks
Effective date:: 01-Oct-2026 -
Decree No. 377/2026/NĐ-CP - Amendments to regulations on bidding for PPP projects and settlement of BT projects
Effective date:: 01-Oct-2026 -
Decree No. 376/2026/NĐ-CP - Renewal of the organizational structure and powers of the Ministry of Finance
Effective date:: 01-Oct-2026 -
Circular No. 138/2026/TT-BTC - New guidelines on corporate bond offering and trading
Effective date:: 01-Oct-2026 -
Decree No. 365/2026/NĐ-CP - Conditions for rice import and export business from October 1, 2026
Effective date:: 01-Oct-2026 -
Law No. 06/2026/QH16 - Amendment to the Law on Emulation and Commendation (2026)
Effective date:: 01-Oct-2026 -
Circular No. 65/2026/TT-BGDĐT - Changes in criteria for recognition of foreign diplomas
Effective date:: 26-Sep-2026 -
Decree No. 312/2026/NĐ-CP - Policies that combine economic development with security
Effective date:: 22-Sep-2026 -
Circular No. 47/2026/TT-BKHCN - Training program for product evaluation and certification experts
Effective date:: 20-Sep-2026 -
Circular No. 33/2026/TT-BNNMT - Amendments to regulations on certification of origin of exported aquatic products
Effective date:: 19-Sep-2026 -
Decree No. 302/2026/NĐ-CP - Regulations and conditions for establishment of the Goods Exchange
Effective date:: 15-Sep-2026 -
Decree No. 349/2026/NĐ-CP - Many major changes in contractor selection from September 9, 2026
Effective date:: 09-Sep-2026 -
Decree No. 292/2026/NĐ-CP - Renewal of the List of prohibited goods and import and export restrictions
Effective date:: 05-Sep-2026 -
Circular No. 154/2026/TT-BCA - Regulations on issuance of identification codes and chemical traceability
Effective date:: 04-Sep-2026 -
Decree No. 285/2026/NĐ-CP - Amendments to the competence of administrative sanctions in the field of sports
Effective date:: 01-Sep-2026 -
Decree No. 284/2026/NĐ-CP - Regulations on administrative sanctions on digital asset transactions
Effective date:: 01-Sep-2026 -
Decree No. 337/2026/NĐ-CP - New regulations on the right to access information of people and businesses
Effective date:: 01-Sep-2026 -
Decree No. 339/2026/NĐ-CP - Sharply increase fines in the fields of construction, housing and real estate
Effective date:: 26-Aug-2026 -
Decree No. 275/2026/NĐ-CP - Increasing the level of sanctions in the field of chemicals and explosives
Effective date:: 25-Aug-2026 -
Decree No. 274/2026/NĐ-CP - New regulations on bidding for business investment projects
Effective date:: 21-Aug-2026 -
Decree No. 330/2026/NĐ-CP - Penalties for violations of cyber security and personal data protection
Effective date:: 19-Aug-2026 -
Decree No. 246/2026/NĐ-CP - Increasing the level of sanctions for violations related to fishery exploitation
Effective date:: 18-Aug-2026 -
Decree No. 323/2026/NĐ-CP - Process of receiving and settling international investment disputes
Effective date:: 17-Aug-2026 -
Decree No. 318/2026/NĐ-CP - Regulations on derivative contracts when opening bankruptcy procedures
Effective date:: 12-Aug-2026 -
Decree No. 219/2026/NĐ-CP - Increasing the fine level for many violations in the field of hydrometeorology
Effective date:: 08-Aug-2026 -
Decree No. 211/2026/NĐ-CP - Increasing fines in the field of animal husbandry
Effective date:: 05-Aug-2026 -
Decree No. 214/2026/NĐ-CP - Increasing the level of sanctions in the field of cultivation and plant quarantine
Effective date:: 05-Aug-2026 -
Decree No. 308/2026/NĐ-CP - Enterprises may set up human resource training funds
Effective date:: 05-Aug-2026 -
Decree No. 204/2026/NĐ-CP - New fines in the field of veterinary medicine (applied from August 1, 2026)
Effective date:: 01-Aug-2026 -
Decree No. 296/2026/NĐ-CP - Amendments to enterprise registration declaration procedures
Effective date:: 23-Jul-2026 -
Decree No. 288/2026/NĐ-CP - Increase in fines for violations related to beneficial owners
Effective date:: 21-Jul-2026 -
Decree No. 186/2026/NĐ-CP - Supplementing sanctioning regulations related to trade names
Effective date:: 15-Jul-2026 -
Circular No. 05/2026/TT-NHNN - Increase the deposit insurance payment limit to VND 350 million
Effective date:: 13-Jul-2026 -
Decree No. 279/2026/NĐ-CP - New powers of the Ministry of Education and Training (applicable from 12/7/2026)
Effective date:: 12-Jul-2026 -
Circular No. 30/2026/TT-BYT - New regulations on inscribing nutritional ingredients on food labels
Effective date:: 10-Jul-2026 -
Decree No. 183/2026/NĐ-CP - Increasing administrative fines in the field of dike protection
Effective date:: 10-Jul-2026 -
Decree No. 208/2026/NĐ-CP - Air transport business conditions as of July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 165/2026/NĐ-CP - New regulations on disease prevention activities
Effective date:: 01-Jul-2026 -
Decree No. 169/2026/NĐ-CP - Aggravating fines in the field of customs and import and export
Effective date:: 01-Jul-2026 -
Circular No. 15/2026/TT-BYT - New regulations on disease prevention activities
Effective date:: 01-Jul-2026 -
Law No. 8/2026/QH16 - Law amending the Law on Vietnam's diplomatic missions abroad
Effective date:: 01-Jul-2026 -
Decree No. 94/2026/NĐ-CP - New regulations on driving license training and exams
Effective date:: 01-Jul-2026 -
Decree No. 253/2026/NĐ-CP - New regulations on PIT declaration and calculation from July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 254/2026/NĐ-CP - New regulations on the use of e-invoices from July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 252/2026/NĐ-CP - New regulations on tax declaration and tax refund
Effective date:: 01-Jul-2026 -
Decree No. 265/2026/NĐ-CP - New sanctioning levels on thrift and anti-waste
Effective date:: 01-Jul-2026 -
Circular No. 27/2026/TT-BNNMT - List of risky products in the agricultural sector
Effective date:: 01-Jul-2026 -
Circular No. 86/2026/TT-BTC - New regulations on tax declaration and payment for imports and exports
Effective date:: 01-Jul-2026 -
Law No. 129/2025/QH15 - Law on Public Employees 2025: Expanding business and practice rights for public employees
Effective date:: 01-Jul-2026 -
Law No. 128/2025/QH15 - Law on Enforcement of Temporary Detention and Detention in 2025
Effective date:: 01-Jul-2026 -
Decree No. 200/2026/NĐ-CP - New regulations on offering corporate bonds (applicable from 5/6/2026)
Effective date:: 05-Jun-2026 -
Circular No. 14/2026/TT-BKHCN - New regulations on assessment and announcement of standard and regulation conformity
Effective date:: 25-May-2026 -
Circular No. 13/2026/TT-BKHCN - New regulations on announcement and application of standards
Effective date:: 24-May-2026 -
Decree No. 114/2026/NĐ-CP - Amendments to the competence to impose administrative penalties in the field of prices
Effective date:: 20-May-2026 -
Decree No. 102/2026/NĐ-CP - Amendments to regulations on sanctions in the field of competition
Effective date:: 20-May-2026 -
Circular No. 22/2026/TT-BNNMT - Many procedures in the field of agriculture and environment are simplified
Effective date:: 19-May-2026 -
Decree No. 98/2026/NĐ-CP - Increasing the level of sanctions in the field of social protection
Effective date:: 16-May-2026 -
Circular No. 05/2026/TT-BYT - List of chemicals banned from use in disinfectant and bactericidal preparations
Effective date:: 15-May-2026 -
Decree No. 81/2026/NĐ-CP - Renewing regulations on administrative sanctions in the field of railway traffic
Effective date:: 15-May-2026 -
Decree No. 86/2026/NĐ-CP - Tightening conditions for trading in prize-winning electronic games
Effective date:: 15-May-2026 -
Decree No. 90/2026/NĐ-CP - New fines in the field of health and pharmacy
Effective date:: 15-May-2026 -
Decree No. 87/2026/NĐ-CP - Increase in fines in the field of advertising and culture
Effective date:: 15-May-2026 -
Decree No. 80/2026/NĐ-CP - Amendments to sanctioning regulations in the field of maritime and waterway traffic
Effective date:: 15-May-2026 -
Decree No. 85/2026/NĐ-CP - New regulations on supplementary pension insurance
Effective date:: 10-May-2026 -
Decree No. 82/2026/NĐ-CP - Amendments to regulations on administrative sanctions related to seas and islands
Effective date:: 04-May-2026 -
Decree No. 79/2026/NĐ-CP - New fines in the field of national border protection
Effective date:: 02-May-2026 -
Decree No. 76/2026/NĐ-CP - Amendments to sanctioning levels for violations related to gender equality
Effective date:: 01-May-2026 -
Decree No. 71/2026/NĐ-CP - Increasing the level of sanctions for violations in the field of atomic energy
Effective date:: 01-May-2026 -
Law No. 111/2025/QH15 - Law on Deposit Insurance 2025 Law No. 06/2012/QH13 - Law of Deposit Insurance
Effective date:: 01-May-2026 -
Decree No. 69/2026/NĐ-CP - Amendments to fine levels and sanctioning competence on fire prevention and fighting
Effective date:: 20-Apr-2026 -
Decree No. 96/2026/NĐ-CP - New regulations on investment conditions and investment incentives
Effective date:: 31-Mar-2026 -
Circular No. 20/2026/TT-BTC - New regulations on conditions for accounting expenses when calculating CIT
Effective date:: 12-Mar-2026 -
Decree No. 31/2026/NĐ-CP - Levels of administrative sanctions in the field of archives
Effective date:: 08-Mar-2026 -
Decree No. 68/2026/NĐ-CP - New tax declaration and payment policy for business households and individuals
Effective date:: 05-Mar-2026 -
Circular No. 18/2026/TT-BTC - Changing the tax calculation method for business households
Effective date:: 05-Mar-2026 -
Law No. 121/2025/QH15 - Law on Supervisory Activities of the National Assembly in 2025
Effective date:: 01-Mar-2026 -
Decree No. 336/2025/NĐ-CP - Many road traffic violations will see increased fines starting March 1, 2026.
Effective date:: 01-Mar-2026 -
Decree No. 357/2025/NĐ-CP - Real estate will be labeled with electronic identification codes from March 1, 2026
Effective date:: 01-Mar-2026 -
Circular No. 47/2025/TT-BNNMT - Announcing the new Regulation on national topographic maps at the scale of 1:10,000
Effective date:: 16-Feb-2026 -
Decree No. 342/2025/NĐ-CP - Tightening regulations on advertising from February 15, 2026
Effective date:: 15-Feb-2026 -
Circular No. 56/2025/TT-BYT - New regulations on occupational disease examination for employees
Effective date:: 15-Feb-2026 -
Decree No. 348/2025/NĐ-CP - Changes in sanctioning authority in the tourism sector from February 15, 2026
Effective date:: 15-Feb-2026 -
Circular No. 136/2025/TT-BTC - Amendments to a number of regulations for securities investment funds
Effective date:: 12-Feb-2026 -
Decree No. 340/2025/NĐ-CP - New fines in the field of currency and banking (applied from 9/2/2026)
Effective date:: 09-Feb-2026 -
Circular No. 121/2025/TT-BTC - Amendments to many important regulations on customs procedures and policies
Effective date:: 01-Feb-2026 -
Circular No. 115/2025/TT-BTC - Amendments to regulations on offering and repurchase of shares
Effective date:: 28-Jan-2026 -
Circular No. 08/2026/TT-BNNMT - New regulations on management of irrigation works
Effective date:: 26-Jan-2026 -
Decree No. 30/2026/NĐ-CP - New regulations on energy labeling on vehicles and equipment
Effective date:: 21-Jan-2026 -
Decree No. 28/2026/NĐ-CP - Renewal of the List of narcotic substances and precursors
Effective date:: 19-Jan-2026 -
Decree No. 24/2026/NĐ-CP - List of basic chemicals and chemicals subject to control (applicable from 17/1/2026)
Effective date:: 17-Jan-2026 -
Decree No. 25/2026/NĐ-CP - New regulations on safety requirements for chemical projects
Effective date:: 17-Jan-2026 -
Decree No. 26/2026/NĐ-CP - New regulations on conditions for production, trading and use of chemicals
Effective date:: 17-Jan-2026 -
Circular No. 01/2026/TT-BCT - Renewal of chemical licensing and declaration processes, forms
Effective date:: 17-Jan-2026 -
Decree No. 310/2025/NĐ-CP - Amending many regulations on administrative sanctions in the field of tax and invoices
Effective date:: 16-Jan-2026 -
Decree No. 19/2026/NĐ-CP - New regulations on appraisal and supervision of projects of national importance
Effective date:: 14-Jan-2026 -
Circular No. 03/2026/TT-BNNMT - List of seafood and aquatic products subject to compulsory quarantine from 13/1/2026
Effective date:: 13-Jan-2026 -
Decree No. 306/2025/NĐ-CP - Supplementing and increasing penalties for many violations in securities trading
Effective date:: 09-Jan-2026 -
Decree No. 292/2025/NĐ-CP - Cases of agricultural land use tax exemption extended until the end of 2030
Effective date:: 01-Jan-2026 -
Decree No. 316/2025/NĐ-CP - New regulations on investment and construction of nuclear power plants
Effective date:: 01-Jan-2026 -
Decree No. 318/2025/NĐ-CP - New regulations on registration of employee information
Effective date:: 01-Jan-2026 -
Circular No. 99/2025/TT-BTC - Replacing the Enterprise Accounting Regime, effective from January 1, 2026
Effective date:: 01-Jan-2026 -
Circular No. 101/2025/TT-BTC - Renewing the special accounting regime for insurance brokerage enterprises
Effective date:: 01-Jan-2026 -
Circular No. 28/2025/TT-BKHCN - Standard information format on digital signature certificates
Effective date:: 01-Jan-2026 -
Decree No. 337/2025/NĐ-CP - Conditions for concluding electronic labor contracts
Effective date:: 01-Jan-2026 -
Resolution No. 111/2025/UBTVQH15 - Criteria for urban classification from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 332/2025/NĐ-CP - Regulations on the framework of radiation safety control and assurance
Effective date:: 01-Jan-2026 -
Decree No. 360/2025/NĐ-CP - New regulations on excise tax from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 2/2026/NĐ-CP - Increasing the fine level for violations in the field of charges and fees
Effective date:: 01-Jan-2026 -
Decree No. 352/2025/NĐ-CP - Conditions for employment service business as of January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 362/2025/NĐ-CP - Officially abolishing the license fee from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 366/2025/NĐ-CP - New regulations on the establishment of state-contributed enterprises
Effective date:: 01-Jan-2026 -
Decree No. 356/2025/NĐ-CP - New regulations on personal data protection and transfer
Effective date:: 01-Jan-2026 -
Law No. 77/2025/QH15 - Amended Law on Economical Use of Energy (applicable from 2026)
Effective date:: 01-Jan-2026 -
Law No. 74/2025/QH15 - Employment Law 2025: Expanding the eligibility for unemployment insurance contributions
Effective date:: 01-Jan-2026 -
Law No. 150/2025/QH15 - Specialized Court Law at the International Financial Center
Effective date:: 01-Jan-2026 -
Decree No. 364/2025/NĐ-CP - Road toll collection and exemption policy from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 374/2025/NĐ-CP - New regulations on unemployment insurance (applicable from January 1, 2026)
Effective date:: 01-Jan-2026 -
Decree No. 353/2025/NĐ-CP - Conditions for testing new digital technology products and services
Effective date:: 01-Jan-2026 -
Circular No. 01/2026/TT-BNNMT - New regulations on quarantine of animal products from 2026
Effective date:: 01-Jan-2026 -
Decree No. 371/2025/NĐ-CP - Officially sanctioning the act of using e-cigarettes from 31/12/2025
Effective date:: 31-Dec-2025 -
Decree No. 290/2025/NĐ-CP - Increasing administrative penalties in the field of water resources
Effective date:: 25-Dec-2025 -
Circular No. 41/2025/TT-BYT - Renewing professional standards for doctors and nurses
Effective date:: 18-Dec-2025 -
Circular No. 102/2025/TT-BTC - Amending some financial safety indicators for securities companies
Effective date:: 15-Dec-2025 -
Decree No. 282/2025/NĐ-CP - Increasing administrative penalties in the field of security and order
Effective date:: 15-Dec-2025 -
Decree No. 313/2025/NĐ-CP - New regulations on receipt and use of foreign aid capital
Effective date:: 08-Dec-2025 -
Circular No. 28/2025/TT-BXD - Economic and technical characteristics of ship inspection services
Effective date:: 01-Dec-2025 -
Circular No. 29/2025/TT-BXD - Economic and technical characteristics of ship inspection services
Effective date:: 01-Dec-2025 -
Circular No. 36/2025/TT-BKHCN - Framework regulations on appraisal and performance of science-technology contracts
Effective date:: 26-Nov-2025 -
Circular No. 16/2025/TT-BNV - Service contract and labor contract templates applicable to state agencies and units
Effective date:: 16-Nov-2025 -
Decree No. 273/2025/NĐ-CP - New regulations on inspection activities in the People's Public Security
Effective date:: 20-Oct-2025 -
Decree No. 236/2025/NĐ-CP - Regulations on global minimum tax declaration and payment from fiscal year 2024
Effective date:: 15-Oct-2025 -
Decree No. 265/2025/NĐ-CP - New regulations on the use of Science and Technology Development Fund of enterprises
Effective date:: 14-Oct-2025 -
Decree No. 269/2025/NĐ-CP - Framework regulations on investment in smart urban development
Effective date:: 14-Oct-2025 -
Circular No. 34/2025/TT-NHNN - New regulations on gold trading (effective from October 10, 2025)
Effective date:: 10-Oct-2025 -
Decree No. 259/2025/NĐ-CP - Framework regulations on import and export of strategic commercial goods
Effective date:: 10-Oct-2025 -
Decree No. 258/2025/NĐ-CP - New regulations on management of parks, trees and water surfaces
Effective date:: 09-Oct-2025 -
Law No. 93/2025/QH15 - Law on Science, Technology and Innovation (2025)
Effective date:: 01-Oct-2025 -
Decree No. 249/2025/NĐ-CP - Remuneration mechanism for experts in science and technology projects
Effective date:: 19-Sep-2025 -
Decree No. 205/2025/NĐ-CP - Supplementing many preferential policies for the supporting industry sector
Effective date:: 01-Sep-2025 -
Decree No. 228/2025/NĐ-CP - Regulations on new penalties in the field of independent audit
Effective date:: 18-Aug-2025 -
Decree No. 167/2025/NĐ-CP - Amending many regulations on customs declaration procedures
Effective date:: 15-Aug-2025 -
Decree No. 218/2025/NĐ-CP - Sanctions from August 5, 2025 in the field of defense and cipher
Effective date:: 05-Aug-2025 -
Law No. 68/2025/QH15 - Law on Investment of State Capital in Enterprises in 2025
Effective date:: 01-Aug-2025 -
Decree No. 135/2025/NĐ-CP - Mechanism for evaluating the performance of banks with 100% capital held by the State
Effective date:: 01-Aug-2025 -
Decree No. 113/2025/NĐ-CP - Framework regulations on the development and updating of archival data
Effective date:: 21-Jul-2025 -
Decree No. 204/2025/NĐ-CP - Procedures for advance and payment of procedural expenses from July 11, 2025
Effective date:: 11-Jul-2025 -
Decree No. 186/2025/NĐ-CP - New regulations on procurement and use of public assets
Effective date:: 01-Jul-2025 -
Circular No. 12/2025/TT-BXD - New regulations on tonnage and loading limits on vehicles
Effective date:: 01-Jul-2025 -
Decree No. 165/2025/NĐ-CP - Regulation on data management, processing and use
Effective date:: 01-Jul-2025 -
Circular No. 12/2025/TT-BNV - New regulations on sickness, maternity, and retirement benefits from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 181/2025/NĐ-CP - New regulations on VAT declaration and deduction apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Circular No. 69/2025/TT-BTC - New guidance on VAT calculation rates and how to determine the refundable VAT amount
Effective date:: 01-Jul-2025 -
Decree No. 178/2025/NĐ-CP - New regulations on the formulation of types of planning
Effective date:: 01-Jul-2025 -
Decree No. 118/2025/NĐ-CP - Framework regulations on settlement of administrative procedures apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 127/2025/NĐ-CP - Regulation on decentralization of authority to manage public assets from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 151/2025/NĐ-CP - Regulation on decentralization of land management from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 158/2025/NĐ-CP - New regulations on compulsory social insurance payment (applied from July 1, 2025)
Effective date:: 01-Jul-2025 -
Decree No. 155/2025/NĐ-CP - Norms for the use of working offices of State agencies apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Circular No. 09/2025/TT-BTP - New powers of the Department of Justice from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 86/2025/NĐ-CP - New regulations on application of trade remedies
Effective date:: 01-Jul-2025 -
Decree No. 105/2025/NĐ-CP - New regulations on fire prevention and fighting, applied from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 106/2025/NĐ-CP - Acts and fines in the field of fire prevention and fighting apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Law No. 51/2024/QH15 - Law on amendments to the Law on Health insurance, applicable from July 01, 2025
Effective date:: 01-Jul-2025 -
Decree No. 150/2025/NĐ-CP - List of Departments and Departments in the provinces applicable from 16/6/2025
Effective date:: 16-Jun-2025 -
Circular No. 01/2025/TT-NHNN - Procedures for granting operation licenses to people's credit funds
Effective date:: 15-Jun-2025 -
Decree No. 77/2025/NĐ-CP - New regulations on nationalization of certain types of property
Effective date:: 01-Apr-2025 -
Decree No. 80/2025/NĐ-CP - New regulations on implementation of legal normative documents
Effective date:: 01-Apr-2025 -
Circular No. 29/2024/TT-BGDĐT - New regulations on provision of extra classes from February 14, 2025
Effective date:: 14-Feb-2025 -
Decree No. 15/2025/NĐ-CP - New regulations on management and operation of railway infrastructure property
Effective date:: 03-Feb-2025 -
Circular No. 12/2025/TT-BCT - New regulations on determining electricity price and model power purchase agreement
Effective date:: 01-Feb-2025 -
Law No. 58/2024/QH15 - 2024 Law on Public Investment Law No. 39/2019/QH14 - 2019 Law on Public Investment
Effective date:: 01-Jan-2025 -
Decree No. 162/2024/NĐ-CP - New requirements for founding shareholders and founding members of banks
Effective date:: 20-Dec-2024 -
Law No. 47/2024/QH15 - 2024 Law on Urban and Rural Planning Law No. 30/2009/QH12 - Law on urban planning (2009)
Effective date:: 01-Jul-2025 -
Law No. 38/2024/QH15 - 2024 Law on National Defense and Security Industry and Industrial Mobilization
Effective date:: 01-Jul-2025 -
Law No. 33/2024/QH15 - 2024 Law on Achieves Law No. 01/2011/QH13 - Law on archives
Effective date:: 01-Jul-2025 -
Law No. 42/2024/QH15 - 2024 Law on management and use of weapons, explosive materials and support instruments
Effective date:: 01-Jan-2025 -
Law No. 35/2024/QH15 - 2024 Law on Road Law No. 23/2008/QH12 - Road Traffic Law 2009
Effective date:: 01-Jan-2025 -
Decree No. 141/2024/NĐ-CP - Occupations that require mandatory HIV testing before recruitment
Effective date:: 15-Dec-2024 -
Circular No. 19/2024/TT-BYT - List of new HS codes of imported, exported medical equipment
Effective date:: 16-Nov-2024 -
Decree No. 123/2024/NĐ-CP - Fines for violations in the field of land apply from 4/10/2024
Effective date:: 04-Oct-2024 -
Circular No. 36/2024/TT-NHNN - Guidelines on classification of debts with regard to cooperative banks
Effective date:: 15-Aug-2024 -
Circular No. 14/2024/TT-NHNN - Criteria for classification of nonperforming loans at microfinance institutions
Effective date:: 12-Aug-2024 -
Decree No. 60/2024/NĐ-CP - Regulations on development and management of markets
Effective date:: 01-Aug-2024 -
Decree No. 104/2024/NĐ-CP - Cases eligible for capital advance from the Land Development Fund from August 1, 2024
Effective date:: 01-Aug-2024 -
Circular No. 40/2024/TT-NHNN - Conditions for provision of payment intermediary services from July 17, 2024
Effective date:: 17-Jul-2024 -
Decree No. 87/2024/NĐ-CP - New sanctions in the field of prices, applied from 12/7/2024
Effective date:: 12-Jul-2024 -
Decree No. 69/2024/NĐ-CP - New regulations on issuance of electronic identification and authentication
Effective date:: 01-Jul-2024 -
Circular No. 18/2024/TT-NHNN - From July 01, 2024: It is allowable to issue electronic bank cards
Effective date:: 01-Jul-2024 -
Circular No. 31/2024/TT-NHNN - New regulations on classification of debts of banks, finance companies
Effective date:: 01-Jul-2024 -
Decree No. 52/2024/NĐ-CP - Payment forms to be considered cashless payments from July 01, 2024
Effective date:: 01-Jul-2024 -
Law No. 26/2023/QH15 - 2023 Law on Identification Law No. 59/2014/QH13 - Law on Citizen identification
Effective date:: 01-Jul-2024 -
Law No. 28/2023/QH15 - 2023 Law on Water Resources Law No. 17/2012/QH13 - 2012 Law on Water resources
Effective date:: 01-Jul-2024 -
Law No. 24/2023/QH15 - 2023 Law on Telecommunications Law No. 41/2009/QH12 - 2019 Law on Telecommunications
Effective date:: 01-Jul-2024 -
Law No. 16/2023/QH15 - 2023 Law on Prices Law No. 11/2012/QH13 - 2012 Law on Prices
Effective date:: 01-Jul-2024 -
Law No. 17/2023/QH15 - 2023 Law on Cooperative Law No. 23/2012/QH13 - Foreigners may become members of cooperatives
Effective date:: 01-Jul-2024 -
Circular No. 71/2023/TT-BCA - Environmental Police Wastewater Inspection Process
Effective date:: 01-Feb-2024 -
Law No. 22/2023/QH15 - 2023 Law on Bidding Law No. 43/2013/QH13 - Law on Bidding (2014)
Effective date:: 01-Jan-2024 -
Resolution No. 107/2023/QH15 - Regulations on payment of global minimum tax in Vietnam
Effective date:: 01-Jan-2024 -
Decree No. 96/2023/NĐ-CP - Regulations on issuance of license to practice medicine applicable from 2024
Effective date:: 01-Jan-2024 -
Law No. 06/2022/QH15 - 2022 Law on emulation and Commendation of Vietnam
Effective date:: 01-Jan-2024 -
Decree No. 74/2023/NĐ-CP - Amendments to some Decrees on activities in the maritime sector
Effective date:: 27-Nov-2023 -
Circular No. 17/2023/TT-BGDĐT - New Regulation on Exams for the Selection of Excellent Student at National Level
Effective date:: 25-Nov-2023 -
Decree No. 17/2023/NĐ-CP - Regulations on copyright, applicable from April 26th, 2023
Effective date:: 26-Apr-2023 -
Circular No. 25/2022/TT-BLĐTBXH - List of personal protective equipment must be provided for employees
Effective date:: 01-Apr-2023 -
Decree No. 35/2022/NĐ-CP - New regulations on establishment of industrial parks and economic zones
Effective date:: 15-Jul-2022