New guidelines on methods of determination of electricity selling and purchasing prices
This Circular applies to generating units that own power plants connected with the national electricity system with total nominal capacity over 30MW, power plants with nominal capacity from 30MW and under volunteer to join electricity market except multi-target strategic hydroelectric plants, independent BOT power plants and power plants using renewable energy (wind, geothermy, tides and biomass);
Other power plants without a separate mechanism prescribed by the Ministry of Industry and Trade shall follow this Circular.
This Circular takes effect from February 03, 2015 and replaces Circular No. 41/2010/TT-BCT⛔ dated December 14, 2010.
- See more the amendments, supplements at the follwoing Circulars:
- - Circular No. 51/2015/TT-BCT⛔ dated December 29th, 2015.
- - Circular No. 13/2017/TT-BCT⛔ dated August 3rd, 2017.
- - Circular No. 45/2018/TT-BCT⛔ dated 15/11/2018.
- This Circular shall be expired from February 22nd, 2021, replaced by Circular No. 57/2020/TT-BCT⛔ dated December 31th, 2020.
Related document |
|
| Please sign in or register an account to view this information | |
Files attachment |
