Posted date: 5-Sep-2025 11:23:30 AM VN
Some new points of the:

Decree No. 57/2025/NĐ-CPstatus2 - New regulations on direct power trading

on replacing of:
  • Decree No. 80/2024/NĐ-CP⛔ - It allowable direct electricity trading from July 03, 2024
Effective date: 03-Mar-2025
Below is a detailed analysis of the new points, changes and removals between the two documents of Decree No. 57/2025/ND-CP (Decree 57/2025/ND-CP) and Decree No. 80/2024/ND-CP (Decree 80/2024/ND-CP):
What's New
The following regulations are completely new, only in Decree No. 57/2025/ND-CP (Decree 57/2025/ND-CP):
• Interpretation of the term "rooftop solar power" (Article 3.3): The specific definition of "rooftop solar power" is electricity produced from photovoltaic panels installed on the roof of a construction work.
• Interpretation of terms on Electricity delivered (Article 3.4): It is clearly stipulated that Electricity delivered by the Seller is the entire electricity delivered by the Seller to the Buyer for payment.
• Explanation of the term "Residual Electricity Generation" (Article 3.17): Specific definition of Residual Electricity Output is the part of the electricity output of the renewable energy generating unit that generates electricity into the national grid or the power grid of zone or cluster models when the electricity output is not sold to large electricity users through the separately connected power grid.
• Conditions for participation in the direct electricity purchase and sale mechanism in year N+1 (Article 5.2.b): Specific regulations on conditions for large electricity users to continue to participate in the direct electricity purchase and sale mechanism in the next year, based on actual electricity consumption.
• Detailed regulations on the residual electricity output of rooftop solar power (Articles 6.3 & 6.4): Specific regulations on the residual electricity output of rooftop solar power sold to EVN or electricity retailers at zones and clusters, rate limits and calculation of purchase and sale prices.
• Responsibilities for negotiating the cost of power grid use services of renewable energy generating units investing in and installing rooftop solar power systems that sell electricity directly to large electricity users in zones and clusters shall be responsible for negotiating with electricity retailers in zones and clusters. on the cost of providing services using the power grid within the model of zones and clusters (Article 7.2).
• Regulations on amending existing power purchase contracts of large electricity users in zones and clusters directly from renewable energy generating units (Article 8.2): Clearly stating the responsibilities of customers in amending existing power purchase contracts to ensure the supply of electricity according to demand.
• Allocation of the actual output of the renewable energy generating unit to the large electricity user (at the point of delivery) according to the principles specified in Clause 1, Article 16 of this Decree (Article 20.3).
• Regulations on the unification of the percentage (%) of electricity output allocated by renewable energy generating units to large electricity users according to the principles specified at Point dd, Clause 1, Article 26 of this Decree (Articles 21.5, 24.1).
• New regulations on reviewing and making a list of large electricity users (within the scope of management) who are not eligible to participate in the direct electricity purchase and sale mechanism in year N, to the electricity system and electricity market operator (Article 22.3).
• New regulations on Uniform signing of power purchase contracts with Power Corporations and Power Companies as prescribed in Clause 2, Article 24 of this Decree (Article 23.3.a).
• Supplementing details on the order and dossier of participation in direct electricity purchase and sale through the national grid (Article 26):
◦ Specific requirements on the written agreement in principle signed between the renewable energy generating unit and the large electricity user or the electricity retailer at the authorized zone and cluster models.
◦ Clearly stipulating the responsibilities of the electricity system and electricity market operator, the Electricity Corporation, and the Vietnam Electricity Group in reviewing and certifying the dossier.
◦ Add a step to guide and implement the agreement with the renewable energy generating unit on the percentage (%) of allocated electricity output.
• Regulations on the order and regime of reporting on the form of direct electricity purchase and sale through the private grid (Article 25).
• Detailing cases and procedures for suspending, terminating and reinstating participation in the direct power purchase and sale mechanism (Article 27):
◦ Clearly classify cases of suspension and payment during the suspension period.
◦ Regulations on the competence to decide on the suspension, termination and restoration of participation in the direct electricity purchase and sale mechanism.
Changes
The following provisions have changes between Decree No. 57/2025/ND-CP (Decree 57/2025/ND-CP) and Decree No. 80/2024/ND-CP (Decree 80/2024/ND-CP):
• Article 2.2.b (Decree No. 57/2025/ND-CP) compared to Article 2.2.b (Decree No. 80/2024/ND-CP): The subjects of large electricity users have changed, Decree No. 80/2024/ND-CP stipulates that "Customers using large electricity for production purposes purchase electricity from the Electricity Corporation or electricity retail units other than the Electricity Corporation connected to voltage levels from 22 kV or more", while Decree No. 57/2025/ND-CP stipulates that "Customers using large electricity for production purposes or customers using large electricity for the purpose of providing electric charging services for vehicles using electricity purchase from the Electricity Corporation, Electricity companies and connected electricity retail units with a voltage level of 22 kV or more". => Addition of large electricity users for the purpose of providing electric charging services for electric vehicles.
• Article 3.5 (Decree No. 57/2025/ND-CP) compared to Article 3.6 (Decree No. 80/2024/ND-CP): The definition of "renewable energy generating unit" is adjusted, removing specific details about the type of power source (solar, wind, small hydropower, etc.) and replacing it with "electricity unit owning a renewable energy power plant specified in Clause 14, Article 4 of the Law on Electricity No. 61/2024/QH15". => Change of reference legal basis.
• Article 3.6 (Decree No. 57/2025/ND-CP) compared to Article 3.7 (Decree No. 80/2024/ND-CP): The definition of "Electricity retail units in zone and cluster models" is changed from "200,000 kWh/month or more" to no regulation on electricity purchase output. => Removal of the requirement for minimum purchased electricity output.
• Article 3.7 (Decree No. 57/2025/ND-CP) compared to Article 3.8 (Decree No. 80/2024/ND-CP): The definition of "Electricity system and electricity market operator" is adjusted to update the current name.
• Article 3.9 (Decree No. 80/2024/ND-CP) - Private connection lines are renamed to Private connection power grids in Article 3.11 (Decree No. 57/2025/ND-CP).
• Article 3.10 (Decree No. 80/2024/ND-CP) - Term contracts has been removed and replaced with definitions related to timing(Articles 3.13 to 3.16).
• Article 3.12 (Decree No. 80/2024/ND-CP) - Large electricity users have undergone major changes, the regulations on average consumption of 200,000 kWh/month or more (calculated on average in the last 12 months), calculated according to the registered output of 200,000 kWh/month or more, have been replaced by reference to the regulations of the Minister of Industry and Trade. => Changes in the criteria for determination Customers who use large electricity refer to the regulations of the Ministry of Industry and Trade.
• Article 4.2.b (Decree No. 80/2024/ND-CP) stipulates that "... Large electricity users or electricity retailers in zones and clusters are authorized to sign power purchase and sale contracts with the Electricity Corporation (or authorized/decentralized units) to purchase all electricity to meet demand", while Article 4.2.c (Decree No. 57/2025/ND-CP) has the adjustment of "Large electricity users (or Units) retailing electricity in authorized zones and clusters) to sign power purchase contracts with the Power Corporation and the Power Company to purchase all electricity to meet electricity demand." => Changing regulations, allowing customers to sign power purchase contracts with both the Power Corporation and the Power Company to meet electricity demand
• Article 6.2 (Decree No. 57/2025/ND-CP) only mentions "Residual electricity output", while Article 6.2 (Decree No. 80/2024/ND-CP) details "Renewable energy power generation units negotiate, agree and sign power purchase contracts on capacity, output, and prices for surplus electricity output with the Electricity of Vietnam (or authorized units) in accordance with the determined.". => Abolishing regulations on electricity purchase and sale in terms of capacity, output, and price for residual electricity output
• Article 16.1 (Decree No. 57/2025/ND-CP) and Article 16.2 (Decree No. 80/2024/ND-CP) changes the electricity bill payment structure of customers.
• Article 20.3 (Decree No. 57/2025/ND-CP) and Article 20.4 (Decree No. 57/2025/ND-CP) compared to Article 20.3 (Decree No. 80/2024/ND-CP) and Article 20.4 (Decree No. 80/2024/ND-CP) have changes in the frequency of publication of the list and electricity consumption of large electricity users, Renewable energy generating units from monthly to quarterly.
• Article 23.1 (Decree No. 57/2025/ND-CP) stipulates "Agreement with large electricity users on the cost of providing services using the power grid within the zones and clusters models (from the total electricity purchase meter of the electricity retailer at the authorized zone and cluster models to the electricity retail meter for large electricity users) in accordance with the within 30 days from the date of receipt of the written request and complete enclosed dossier of the large electricity user", meanwhile, Article 23.1 (Decree No. 80/2024/ND-CP) stipulates "Agreement with large electricity users on the retail cost in the industrial park fence, economic zones, export processing zones, industrial clusters, hi-tech parks, concentrated information technology parks, high-tech agricultural zones in accordance with regulations of the Ministry of Industry and Trade within 30 days from the date of receipt of written requests and complete enclosed dossiers of large electricity users.". => Changes in retail costs in the fences of industrial parks, economic zones, etc. into the cost of providing services using the power grid and no longer required in accordance with the regulations of the Ministry of Industry and Trade
• Article 26.3.c (Decree No. 57/2025/ND-CP) stipulates: "Review the responsiveness of the document agreeing on the percentage (%) of electricity output allocated by renewable energy generating units to large electricity users or electricity retailers at authorized zone and cluster models according to the principles specified at Point dd, Clause 1 of this Article", Meanwhile, Article 26.3.c (Decree No. 80/2024/ND-CP) stipulates: "Review the responsiveness of dossiers sent by large electricity users or electricity retailers at authorized zone and cluster models according to the provisions of Point dd, Clause 1 of this Article. In case the actual electricity output of the renewable energy generating units has a term contract with the large electricity user or the electricity retailer at the authorized zone or cluster models that cannot be determined, the electricity system and electricity market operator shall guide the large electricity user or the retailing electricity at authorized zones and clusters to re-agree with renewable energy generating units on the principle of allocation.". => Change the responsibilities of the electricity system operator and the electricity market if there are renewable energy generating units that cannot determine the allocation principle.
• Article 28.2.b (Decree No. 80/2024/ND-CP) stipulates "Report on the implementation and results of the implementation of the mechanism for direct electricity purchase and sale through the national grid nationwide of the preceding quarter", meanwhile, Article 28.2.a (Decree No. 57/2025/ND-CP) stipulates "Report on the results of direct electricity purchase and sale through the national grid in M-1" and Article 28.2.b (Decree No. 57/2025/ND-CP) stipulates "Report on the results of direct power purchase and sale through the National Grid of year N-1". => Change the reporting regime from quarterly to monthly and annual reports.
Removal Points
The following concepts and regulations are contained in Decree No. 80/2024/ND-CP (Decree 80/2024/ND-CP) but are not mentioned at all in Decree No. 57/2025/ND-CP (Decree 57/2025/ND-CP), which can be understood as no longer regulated:
• Specific terms of the contract are allowed to be negotiated and amended (Appendices I, II, III): Decree No. 80/2024/ND-CP stipulates many terms in the Addendum that the parties can negotiate and adjust. Decree No. 57/2025/ND-CP repeals these regulations.
• Explanation of terms about Bidding, Connection Point, Payment Cycle, Forward Contract (Article 3): These definitions are no longer in Decree No. 57/2025/ND-CP.
• The requirement to obtain the National Technical Regulation on electricity safety for large electricity users is in Article 8.2 of Decree No. 80/2024/ND-CP: In Decree No. 57/2025/ND-CP, this requirement is no longer available.
• Contract termination clause: According to the document of the state agency to sign the power purchase contract according to the new regulations. (Article 7.6a, Decree No. 80/2024/ND-CP): Decree No. 57/2025/ND-CP no longer stipulates this provision.
• Responsibility of the Electricity of Vietnam to check the calculation results of the Electricity Corporation on the expected power loss rate in year N (KPP) and announce this rate before November 30, N-1 (Article 19.2): In Decree No. 57/2025/ND-CP, this responsibility has been eliminated.
Important Note:
• The above analysis is based on a direct comparison of the content of the two texts provided. In order to have an absolutely accurate conclusion and properly apply the law, it is necessary to refer to all official documents, guiding documents and opinions of competent agencies.
• This analysis focuses only on key differences in terms of content. There may be minor changes in language or sentence structure that are not mentioned.