Please sign in or register an account to view full version.
Posted date: 27-Oct-2025 2:16:44 PM
VN
Some amends and supplements of the
Decree No. 85/2025/NĐ-CP⚠️ - Framework regulations on public investment from April 08, 2025
within:
Effected from: 18-Oct-2025
New additions
◦ Article 1.1b: Add Clause 6a to Article 1 of Decree 85/2025/ND-CP, related to Clause 3, Article 36a on the limit for appraising capital sources and capital balancing ability.
◦ Article 1.4: Add Article 9a after Article 9 of Decree 85/2025/ND-CP, regulating the order and procedures for deciding on investment policies for nuclear power plant projects under the authority of the Prime Minister.
◦ Article 1.7: Add Article 15a after Article 15 of Decree 85/2025/ND-CP, regulating the limit for appraising capital sources and capital balancing ability.
◦ Article 1.11d: Add Clause 4a after Clause 4, Article 44, stipulating that the Ministry of Science and Technology estimates the total demand for public investment plans for the following year to be allocated to the fields of science, technology, innovation and digital transformation.
◦ Article 1.11h: Add clauses 9 and 10 after clause 8, Article 44, the Prime Minister assigns the capital plan and detailed allocation.
◦ Article 1.15: Add clause la before clause 2, Article 56, the Ministry of Science and Technology is responsible for guiding, urging and reviewing.
◦ Article 1.17: Add point p after point o, clause 2 in Section V, Part A, Appendix I, adding the item on digital technology industry projects.
### Changes
| Focus | Old (Decree 85/2025/ND-CP) | New (Decree 275/2025/ND-CP) |
|---|---|---|
| Article 1.1a: Clause 5 Article 1 (Scope of regulation) | 5. Clause 12 Article 18 on decentralization of authority, order and procedures for deciding on investment policies for programs and projects using capital from legal revenue sources of state agencies and public service units for investment in accordance with regulations on financial autonomy of agencies and units; order and procedures for deciding on investment policies for projects using local budget capital implemented by central agencies, projects using district and commune budget capital implemented by provincial agencies; dossiers, contents and time for appraisal and decision on investment policies for programs and projects. | 5. Clause 12, Article 18 on decentralization of authority, order and procedures for deciding on investment policies for programs and projects using capital from legal revenue sources of state agencies and public service units for investment in accordance with regulations on financial autonomy of agencies and units; order and procedures for deciding on investment policies for projects using local budget capital implemented by central agencies, projects using commune-level budget capital implemented by provincial agencies; dossiers, contents and time for appraisal and decision on investment policies for programs and projects and order and procedures for deciding on investment policies for projects under the authority of the Prime Minister. |
| Article 1.2: Article 2 (Subjects of application) | This Decree applies to agencies, units, organizations and individuals participating in or related to public investment activities, management and use of public investment capital. | 1. This Decree applies to agencies, units, organizations and individuals participating in or related to public investment activities, management and use of public investment capital. 2. The preparation of estimates, management, use and settlement of regular expenditures from the state budget for purchasing, repairing, renovating and upgrading assets and equipment; spending on renting goods and services; repairing, renovating, upgrading, expanding and constructing new construction items in invested and constructed projects and other necessary tasks shall comply with the provisions of the law on the state budget and other relevant laws. |
| Article 1.3a: Clause 2, Article 4 (Sectors and fields using public investment capital) | Security, order and social safety: Tasks, programs and projects in sectors and fields serving the goals of security, order and social safety, fire prevention and fighting, investigation and prevention of crimes, execution of criminal sentences, response to natural disasters and search and rescue of specialized central and local units according to decentralization, housing for the people's armed forces purchased or invested in construction by the Ministry of Public Security. | Security, order and social safety: Tasks, programs and projects in sectors and fields serving the goals of security, order and social safety, fire prevention and fighting, investigation and prevention of crimes, execution of criminal sentences, response to natural disasters and search and rescue of central and local specialized units according to decentralization, housing for the people's armed forces purchased or invested in construction by the Ministry of Public Security, ensuring network security, data security and information security. |
| Article 1.3b: Clause 4, Article 4 (Sectors and fields using public investment capital) | Science and technology: Tasks, programs, investment projects in building infrastructure, facilities, equipment, and technology to serve the goals of developing science, technology, experiments, experiments, analysis, inspection, testing, standards - measurement - quality, intellectual property, atomic energy, nuclear energy and new types of energy, radiation and nuclear safety, scientific and technological information and statistics, specialized designs in the fields of natural sciences and engineering, technology application and transfer, semiconductor microchips, artificial intelligence; innovation centers, research and development, support for industrial development, high-tech zones, high-tech agricultural, forestry, and fishery zones. | Science, technology, innovation and digital transformation: Tasks, programs, investment projects in building infrastructure, facilities, databases, equipment, technology serving the goals of developing science, technology, innovation and digital transformation, experiments, experiments, analysis, inspection, testing, specialized museums, standards - measurement - quality, intellectual property, atomic energy, nuclear energy and new types of energy, radiation and nuclear safety, scientific and technological information and statistics, specialized design in the fields of natural sciences and engineering, technology application and transfer, semiconductor microchips, artificial intelligence; innovation centers, research and development, support for industrial development, high-tech zones, high-tech agricultural, forestry and fishery zones; application of information technology, digital infrastructure, digital platforms, application software, shared services, leasing of information technology services for digital transformation; development of infrastructure, facilities, digital platforms, international information technology infrastructure; support for innovation, support for creative startups; innovation centers; innovation clusters; organizations supporting creative startups; centers supporting creative startups; research and development centers. |
| Article 1.3c: Clause 5, Article 4 (Sectors and fields using public investment capital) | Health, population and family: Tasks, programs, and investment projects in building infrastructure, facilities, and investing in equipment serving health goals including preventive medicine, medical examination, treatment, rehabilitation, medical examination, forensic medicine, forensic psychiatry, traditional medicine, medical equipment; cosmetics, food safety, health insurance, population, reproductive health. | Health, population and family: Tasks, programs, and investment projects in building infrastructure, facilities, and investing in equipment serving health goals including preventive medicine; medical examination, treatment, rehabilitation; medical examination, forensic medicine, forensic psychiatry; traditional medicine and pharmacy; medical equipment; pharmaceuticals, cosmetics; food safety; health insurance; population, reproductive health. |
| Article 1.5: Title of Article and first paragraph of Clause 2, Article 10 (Procedures for deciding on investment policy) | 2. For projects in which the People's Committees at provincial and district levels are the governing bodies using capital from lower-level local budgets, the order and procedures for deciding on investment policy are as follows: | 2. For projects in which the People's Committees at provincial levels are the governing bodies using capital from lower-level local budgets, the order and procedures for deciding on investment policy are as follows: |
| Article 1.6: Point c, Clause 3, Article 15 (Stopping investment policy) | c) The investment policy decision-making authority shall consider and decide on stopping the investment policy of a program or project, including deciding on a handling plan for the implemented volume of the program or project according to the provisions of law on management and use of public assets and relevant legal provisions. | c) The investment policy decision-making authority shall consider and decide on stopping the investment policy of a program or project, including deciding on a handling plan for the implemented volume of the program or project according to the provisions of the Government on management, payment, and settlement of projects using public investment capital and relevant legal provisions. |
| Article 1.8: Point d, Clause 2, Article 20 (Documents and contents of appraisal of public investment programs) | d) Contents specified in Article 47 of the Law on Public Investment; conformity between the total investment capital of the program and the medium-term and annual public investment plan; structure of capital sources from the central budget, local budget and other legal capital sources; ability to recover capital and repay debt in case of using borrowed capital. | d) Conformity with capital sources and ability to balance capital for public investment programs; assessment of capital sources, ability to balance capital, capital arrangement plan for national target programs; conformity between the total investment capital of the program and the medium-term and annual public investment plan; structure of capital sources from the central budget, local budget and other legal capital sources; ability to recover capital and repay debt in case of using borrowed capital. |
| Article 1.9: Clause 3, Article 30 (Authority to appraise and approve project designs and estimates) | 3. For projects managed by the People's Committees at district and commune levels and projects authorized by the Chairman of the Provincial People's Committee to decide on investment, the assigned functional unit under the People's Committees at district and commune levels shall preside over the appraisal of the design and investment estimates of the project and submit them to the Chairman of the People's Committee at the same level for approval in the case of one-step design projects. The investor shall approve the detailed design and estimates in the case of two-step design. The approval of the detailed design and estimates shall be carried out simultaneously, without separating the detailed design from the estimates. | 3. For projects managed by the People's Committee of the commune level and projects authorized by the Chairman of the People's Committee of the province to decide on investment, the assigned functional unit under the People's Committee of the commune level shall preside over the appraisal of the design and investment estimate of the project and submit it to the Chairman of the People's Committee of the same level for approval in the case of one-step design projects. The investor shall approve the detailed design and estimate in the case of two-step design. The approval of the detailed design and estimate shall be carried out simultaneously, without separating the detailed design from the estimate. |
| Article 1.10a: Clause 1, Article 43 (Procedures for preparing, approving, and assigning medium-term public investment plans using state budget capital) | 1. Before June 15 of the fourth year of the medium-term public investment plan, the Ministry of Finance shall submit to the Prime Minister for issuance of a directive on preparing medium-term public investment plans for the following period. | Repealing Clause 1 |
| Article 1.10b: Point b, Clause 3, Article 43 (Procedures for preparing, approving, and assigning medium-term public investment plans from the state budget) | Synthesize the needs for medium-term public investment plans in the next period, capital sources, capital levels for each program, task, project, and other public investment objects, and send them to the Ministry of Finance according to the schedule prescribed by the Prime Minister. | Synthesize the needs for medium-term public investment plans in the next period, according to capital sources, capital levels for each program, task, project, and other public investment objects, and send them to the Ministry of Finance according to the schedule prescribed by the Prime Minister. For the need to arrange central budget capital for programs, tasks, and projects in the fields of science, technology, innovation, and digital transformation, ministries and central agencies are responsible for consulting the Ministry of Science and Technology to complete before sending them to the Ministry of Finance. The Ministry of Science and Technology is responsible for giving comments within 07 working days from the date of receiving the proposal of the ministry or central agency |
| Article 1.10c: Point c, Clause 4, Article 43 (Procedures for preparing, approving, and assigning medium-term public investment plans using state budget capital) | Synthesize the needs for medium-term public investment plans in the next period of the provincial, district, and commune levels in detail according to each capital source, capital level for each program, task, project, and other public investment objects, and send them to the Ministry of Finance according to the schedule prescribed by the Prime Minister. | Synthesize the needs for medium-term public investment plans in the next period of the provincial, commune levels in detail according to each capital source, capital level for each program, task, project, and other public investment objects, and send them to the Ministry of Finance according to the schedule prescribed by the Prime Minister. Regarding the need to arrange central budget capital for programs, tasks, and projects in the fields of science, technology, innovation, and digital transformation, the Provincial People's Committee is responsible for consulting the Ministry of Science and Technology to complete before sending it to the Ministry of Finance. The Ministry of Science and Technology is responsible for providing comments within 07 working days from receiving the local proposal |
| Article 1.10d: Point b, Clause 6, Article 43 (Procedure for preparing, approving, and assigning medium-term public investment plans using state budget capital) | b) Assign the specialized agency managing public investment to synthesize the detailed medium-term public investment plan for the following period according to each capital source, capital level for each program, task, project, and other public investment objects and the contents as prescribed in Article 52 of the Law on Public Investment, and send it to the Ministry of Finance according to the schedule prescribed by the Prime Minister and instructions of the Ministry of Finance. | b) Assign the specialized agency in charge of public investment management to synthesize the expected medium-term public investment plan for the next period in detail according to each capital source, capital level for each program, task, project and other public investment objects and the contents as prescribed in Article 52 of the Law on Public Investment, and send it to the Ministry of Finance for synthesis before August 30 of the fifth year of the previous medium-term public investment plan. For the expected medium-term public investment plan for the next period, the central budget source is allocated for programs, tasks and projects in the fields of science, technology, innovation and digital transformation, ministries and central agencies are responsible for consulting the Ministry of Science and Technology to complete before sending it to the Ministry of Finance. The Ministry of Science and Technology is responsible for providing comments within 10 working days from the date of receiving the proposal of the ministry or central agency. |
| Article 1.10e: Point a, Clause 7, Article 43 (Procedure for preparing, approving, and assigning medium-term public investment plans using state budget capital) | a) Notify the expected ability to balance the state budget for public investment expenditure in the following period to each agency, affiliated unit, and People's Committees at all levels as a basis for preparing the expected medium-term public investment plan for the following period; | a) Notify the expected ability to balance the state budget for public investment expenditure in the following period to each agency, affiliated unit, and Commune-level People's Committee as a basis for preparing the expected medium-term public investment plan for the following period; |
| Article 1.10g: Point c, Clause 7, Article 43 (Procedures for preparing, approving, and assigning medium-term public investment plans using state budget capital) | c) Assign the People's Committees at district and commune levels to organize the preparation of the medium-term public investment plan for the next period of their level, submit it to the People's Council at the same level for comments before July 31 of the fifth year of the medium-term public investment plan for the previous period, and complete it and send it to the People's Committee at the higher level according to regulations; | c) Assign the Commune-level People's Committees to organize the preparation of the medium-term public investment plan for the next period of their level, submit it to the People's Council at the same level for comments before July 31 of the fifth year of the medium-term public investment plan for the previous period, and complete it and send it to the People's Committee at the higher level according to regulations; |
| Article 1.10h: Point d, Clause 7, Article 43 (Procedures for preparing, approving, and assigning medium-term public investment plans using state budget capital) | d) Synthesize the expected medium-term public investment plans for the next period of the provincial, district, and commune levels in detail according to each capital source, capital level for each program, task, project, and other public investment objects, and the contents as prescribed in Article 52 of the Law on Public Investment, and send them to the Ministry of Finance before August 30 of the fifth year of the previous medium-term public investment plan. | d) Synthesize the expected medium-term public investment plans for the next period of the provincial, commune levels in detail according to each capital source, capital level for each program, task, project, and other public investment objects, and the contents as prescribed in Article 52 of the Law on Public Investment, and send them to the Ministry of Finance for synthesis before August 30 of the fifth year of the previous medium-term public investment plan. For the medium-term public investment plan for the next period, the central budget source is allocated for programs, tasks, and projects in the fields of science, technology, innovation, and digital transformation, the Provincial People's Committee is responsible for consulting the Ministry of Science and Technology to complete before sending it to the Ministry of Finance. The Ministry of Science and Technology is responsible for providing comments within 10 working days from the date of receiving the local proposal. |
| Article 1.10i: Point b, Clause 9, Article 43 (Procedures for preparing, approving, and assigning medium-term public investment plans using state budget capital) | b) Assign the specialized agency in charge of public investment management to synthesize the detailed medium-term public investment plan for the next period according to each capital source, capital level for each program, task, project, and other public investment object, and the contents as prescribed in Article 52 of the Law on Public Investment, and send it to the Ministry of Finance according to the schedule prescribed by the Prime Minister and the guidance of the Ministry of Finance. | b) Assign the specialized agency in charge of public investment management to synthesize the detailed medium-term public investment plan for the next period according to each capital source, capital level for each program, task, project, and other public investment object, and the contents as prescribed in Article 52 of the Law on Public Investment, and send it to the Ministry of Finance for synthesis according to the schedule prescribed by the Prime Minister and the guidance of the Ministry of Finance. For the medium-term public investment plan for the next period, the central budget source is allocated for programs, tasks, and projects in the fields of science, technology, innovation, and digital transformation. Ministries and central agencies are responsible for consulting the Ministry of Science and Technology to complete before sending it to the Ministry of Finance. The Ministry of Science and Technology is responsible for providing comments within 10 working days from the date of receiving the proposal from the ministry or central agency. |
| Article 1.10k: Point b, Clause 10, Article 43 (Procedures for preparing, approving, and assigning medium-term public investment plans using state budget capital) | b) Assign the People's Committees at district and commune levels to complete their medium-term public investment plans for the next period, submit them to the People's Councils at the same level for approval before March 10 of the first year of the medium-term public investment plan for the next period, and send them to the People's Committees at higher levels according to regulations; | b) Assign the Commune-level People's Committees to complete their medium-term public investment plans for the next period, submit them to the People's Councils at the same level for approval before March 10 of the first year of the medium-term public investment plan for the next period, and send them to the People's Committees at higher levels according to regulations; |
| Article 1.101: Point c, Clause 10, Article 43 (Procedures for preparing, approving, and assigning medium-term public investment plans using state budget capital) | c) Synthesize the medium-term public investment plans for the next period of the provincial, district, and commune levels in detail according to each capital source, capital level for each program, task, project, and other public investment objects, and the contents as prescribed in Article 52 of the Law on Public Investment, and send them to the Ministry of Finance according to the schedule prescribed by the Prime Minister and the guidance of the Ministry of Finance. | c) Synthesize the medium-term public investment plans for the next period of the provincial, commune levels in detail according to each capital source, capital level for each program, task, project, and other public investment objects, and the contents as prescribed in Article 52 of the Law on Public Investment, and send them to the Ministry of Finance for synthesis according to the schedule prescribed by the Prime Minister and the guidance of the Ministry of Finance. For the medium-term public investment plan for the next period, the central budget source is allocated for programs, tasks, and projects in the fields of science, technology, innovation, and digital transformation. The Provincial People's Committee is responsible for consulting the Ministry of Science and Technology to complete before sending it to the Ministry of Finance. The Ministry of Science and Technology is responsible for providing comments within 10 working days from the date of receiving the local proposal. |
| Article 1.10m: Add clause 12 after clause 11, Article 43 (Procedure for preparing, approving and assigning medium-term public investment plans using state budget capital) | - | 12. The Prime Minister assigns the total capital of the medium-term public investment plan using state budget capital, the total central budget capital to ministries, central and local agencies; the list and capital levels of public investment programs and projects, the total capital for planning tasks, the total capital for investment preparation tasks, and other public investment objects using central budget capital. |
| Article 1.11a: Clause 2, Article 44 (Procedures for preparing, approving, and assigning annual public investment plans using state budget capital) | 2. Before June 15 of each year, the Ministry of Finance shall guide ministries, central agencies, and localities on socio-economic development plans and objectives, requirements, contents, time, and progress of preparing public investment plans for the following year. | 2. No later than 10 days after the Prime Minister issues regulations on preparing socio-economic development plans and state budget estimates for the following year, the Ministry of Finance shall guide ministries, central agencies, and localities on socio-economic development plans and objectives, requirements, contents, time, and progress of preparing public investment plans for the following year. The Ministry of Science and Technology guides ministries, central and local agencies on the goals, requirements, and contents of next year's public investment planning for programs, tasks, and projects in the fields of science, technology, innovation, and digital transformation. |
| Article 1.11b: Clause 3, Article 44 (Procedures for preparing, approving, and assigning annual public investment plans using state budget capital) | 3. Before June 30 of each year, ministries, central and local agencies shall guide subordinate agencies and units to prepare public investment plans for the following year. | 3. No later than 07 days from the date the Ministry of Finance issues guiding documents, ministries, central and local agencies shall guide subordinate agencies and units to prepare public investment plans for the following year. |
| Article 1.11c: Clause 4, Article 44 (Procedures for preparing, approving, and assigning annual public investment plans using state budget capital) | 4. Before July 30 every year, ministries, central agencies, and provincial People's Committees shall synthesize the needs for annual public investment plans using state budget capital and send them to the Ministry of Finance. | 4. Before July 10 every year, ministries, central agencies, and provincial People's Committees shall synthesize the needs for the following year's public investment plans and send them to the Ministry of Finance and the State Audit Office; and send them to the Ministry of Science and Technology for the needs for capital plans allocated to the fields of science, technology, innovation, and digital transformation. |
| Article 1.11e: Clause 5, Article 44 (Procedures for preparing, approving, and assigning annual public investment plans using state budget capital) | 5. Before August 10 of each year, the Ministry of Finance shall submit to the Government the expected state budget revenue and expenditure and state budget development investment expenditure for the following year. | 5. Before August 10 of each year: a) The Ministry of Finance shall report to the Prime Minister for approval of the expected capital allocation plan for the public investment plan using central budget capital for the following year. Based on the expected capital allocation plan for the public investment plan using central budget capital for the following year approved by the Prime Minister, the Ministry of Finance shall notify the expected central budget development investment capital to be allocated to ministries, central agencies, and localities for the public investment plan for the following year. b) The Ministry of Science and Technology sends the Ministry of Finance the public investment plan for the following year, expected to be allocated to the fields of science, technology, innovation and digital transformation of each ministry, central agency and locality. |
| Article 1.11g: Clause 7, Article 44 (Procedures for preparing, approving, and assigning annual public investment plans using state budget capital) | 7. Ministries, central agencies, and provincial People's Committees are responsible for synthesizing annual public investment plans, including the list and capital level allocated for each program, task, project, and other public investment object, and sending them to the Ministry of Finance before September 1 of each year. | 7. Before September 1 of each year, ministries, central agencies, and provincial People's Committees are responsible for synthesizing the following year's public investment plan, including the list and capital level expected to be allocated for each program, task, project, and other public investment object, and sending them to the Ministry of Finance. For the capital plan expected to be allocated for the fields of science and technology, innovation and digital transformation, the Ministry of Science and Technology synthesizes and proposes the public investment plan for the following year for each ministry, central agency and locality, including the list and capital level allocated for each program, task, project and other public investment objects for central budget capital and the total capital for local budget capital, and sends it to the Ministry of Finance. |
| Article 1.11h: Add clause 9 and clause 10 after clause 8, Article 44 (Procedure for preparing, approving and assigning annual public investment plans using state budget capital) | - | 9. Before December 15 of each year, the Prime Minister shall assign the following year's state budget public investment plan according to the total capital and capital structure decided by the National Assembly to ministries, central agencies and localities, including the minimum central budget capital plan that ministries, central agencies and localities must allocate for programs, tasks, projects and other public investment objects in the fields of science, technology, innovation and digital transformation. 10. Before December 31 of each year, ministries, central agencies and localities shall allocate in detail the capital level of the next year's state budget investment plan, the list and capital level allocated for each task and project, send the detailed allocation plan to the Ministry of Finance for synthesis, reporting to the Government and monitoring implementation and send to the Ministry of Science and Technology for the following year's public investment plan allocated for the fields of science, technology, innovation and digital transformation for monitoring implementation present. |
| Article 1.12: First paragraph of Clause 2, Article 47 (Time for arranging capital to implement the project) | 2. In case the project has had its capital arrangement period extended according to the provisions of Point b, c, Clause 3, Article 57 of the Law on Public Investment but still needs to extend the time for arranging capital to implement the project, the ministry, central agency, provincial People's Committee shall review its responsibilities, report to the Prime Minister for consideration and decision to extend the time for arranging capital to implement the project for central budget capital, People's Committees at all levels shall review their responsibilities, report to the People's Council at the same level for consideration and decision to extend the time for arranging capital to implement the project for local budget capital, ensuring the following requirements: | 2. In case the project exceeds the capital allocation time as prescribed in Clause 2 and Points b, c, d Clause 3, Article 57 of the Law on Public Investment but still needs to extend the capital allocation time to implement the project, the ministry, central agency, provincial People's Committee shall review responsibilities, report to the Prime Minister for consideration and decision to extend the capital allocation time to implement the project for central budget capital, People's Committees at all levels shall review responsibilities, report to the People's Council at the same level for consideration and decision to extend the capital allocation time to implement the project for local budget capital ensuring the following requirements: |
| Article 1.13: Change Article 50 (Adjustment of public investment plan) | Heads of ministries, central agencies, and provincial People's Committees, based on the necessity and requirements for project implementation and disbursement progress, shall assign specialized agencies in charge of public investment management to review and propose plans to adjust the medium-term and annual public investment plans of their agencies and localities, and submit them to competent authorities for decision according to the provisions of Article 71 of the Law on Public Investment. 2. People's Committees at all levels, based on the necessity and requirements for project implementation and disbursement progress, shall assign specialized agencies in charge of public investment management to review and propose plans to adjust the medium-term and annual public investment plans of their local budgets, and submit them to competent authorities for decision according to the provisions of Article 71 of the Law on Public Investment. 3. Time for adjusting annual state budget investment plans between projects within ministries, central agencies and localities before November 15 of the planning year. | 1. The Government decides to adjust annual public investment plans with central budget capital but not exceeding the total central budget expenditure of the whole country as decided by the National Assembly in the following cases: a) Overall adjustment of annual public investment plans with central budget capital of the whole country; b) Adjustment of annual public investment plans with central budget capital between ministries, central agencies and localities based on proposals of ministries, central agencies and localities before December 15 of the planning year; c) Proactively reduce and adjust annual public investment plans with central budget capital of ministries, central agencies and localities to supplement capital for other ministries, central agencies and localities before December 15 of the planning year; d) Adjust the annual public investment plan of central budget capital of ministries and central agencies. |
Change analysis
Found 644 posts
Export list to Excel
-
Decree No. 319/2026/NĐ-CP - Mandatory roadmap for installing cruise monitoring devices and cameras on vehicles
Effective date:: 01-Jul-2027 -
Law No. 13/2026/QH16 - Law on Prevention and Control of the Proliferation of Weapons of Mass Destruction
Effective date:: 01-Jul-2027 -
Law No. 15/2026/QH16 - Law Amending the Law on State Compensation Liability (2026)
Effective date:: 01-Mar-2027 -
Decree No. 419/2026/NĐ-CP - New penalties in the mineral sector, effective from January 15, 2027
Effective date:: 15-Jan-2027 -
Decree No. 415/2026/NĐ-CP - New penalty levels in the field of science and technology transfer
Effective date:: 05-Jan-2027 -
Decree No. 399/2026/NĐ-CP - The minimum wage from January 1, 2027 will increase by at least 310,000 VND/month
Effective date:: 01-Jan-2027 -
Decree No. 372/2026/NĐ-CP - Regulations on attaching identifiers and product traceability
Effective date:: 01-Jan-2027 -
Decree No. 384/2026/NĐ-CP - Criteria for determining the origin of Vietnam for goods circulated in the country
Effective date:: 01-Jan-2027 -
Decree No. 401/2026/NĐ-CP - Sanctioning levels in the field of digital technology industry (applied from 22/12/2026)
Effective date:: 22-Dec-2026 -
Decree No. 391/2026/NĐ-CP - New fines in the field of betting and prize games, applicable from 5/12/2026
Effective date:: 05-Dec-2026 -
Decree No. 393/2026/NĐ-CP - Conditions for exemption and issuance of work permits for foreigners from 5/12/2026
Effective date:: 05-Dec-2026 -
Circular No. 145/2026/TT-BTC - New regulations on clearing and settlement of securities transactions
Effective date:: 16-Nov-2026 -
Decree No. 379/2026/NĐ-CP - Renewal of standards and norms for the use of public cars
Effective date:: 16-Nov-2026 -
Decree No. 374/2026/NĐ-CP - Regulations on bidding within the framework of free trade agreements
Effective date:: 14-Nov-2026 -
Decree No. 363/2026/NĐ-CP - Penalties for violations in the field of data
Effective date:: 11-Nov-2026 -
Decree No. 385/2026/NĐ-CP - New regulations on control of administrative procedures
Effective date:: 10-Oct-2026 -
Decree No. 328/2026/NĐ-CP - Regulations on measures to prevent and handle fake news
Effective date:: 05-Oct-2026 -
Decree No. 316/2026/NĐ-CP - Amendments to the financial regime for state-owned banks
Effective date:: 01-Oct-2026 -
Decree No. 377/2026/NĐ-CP - Amendments to regulations on bidding for PPP projects and settlement of BT projects
Effective date:: 01-Oct-2026 -
Decree No. 376/2026/NĐ-CP - Renewal of the organizational structure and powers of the Ministry of Finance
Effective date:: 01-Oct-2026 -
Circular No. 138/2026/TT-BTC - New guidelines on corporate bond offering and trading
Effective date:: 01-Oct-2026 -
Decree No. 365/2026/NĐ-CP - Conditions for rice import and export business from October 1, 2026
Effective date:: 01-Oct-2026 -
Law No. 06/2026/QH16 - Amendment to the Law on Emulation and Commendation (2026)
Effective date:: 01-Oct-2026 -
Circular No. 65/2026/TT-BGDĐT - Changes in criteria for recognition of foreign diplomas
Effective date:: 26-Sep-2026 -
Decree No. 312/2026/NĐ-CP - Policies that combine economic development with security
Effective date:: 22-Sep-2026 -
Circular No. 47/2026/TT-BKHCN - Training program for product evaluation and certification experts
Effective date:: 20-Sep-2026 -
Circular No. 33/2026/TT-BNNMT - Amendments to regulations on certification of origin of exported aquatic products
Effective date:: 19-Sep-2026 -
Decree No. 302/2026/NĐ-CP - Regulations and conditions for establishment of the Goods Exchange
Effective date:: 15-Sep-2026 -
Decree No. 349/2026/NĐ-CP - Many major changes in contractor selection from September 9, 2026
Effective date:: 09-Sep-2026 -
Decree No. 292/2026/NĐ-CP - Renewal of the List of prohibited goods and import and export restrictions
Effective date:: 05-Sep-2026 -
Circular No. 154/2026/TT-BCA - Regulations on issuance of identification codes and chemical traceability
Effective date:: 04-Sep-2026 -
Decree No. 285/2026/NĐ-CP - Amendments to the competence of administrative sanctions in the field of sports
Effective date:: 01-Sep-2026 -
Decree No. 284/2026/NĐ-CP - Regulations on administrative sanctions on digital asset transactions
Effective date:: 01-Sep-2026 -
Decree No. 337/2026/NĐ-CP - New regulations on the right to access information of people and businesses
Effective date:: 01-Sep-2026 -
Decree No. 339/2026/NĐ-CP - Sharply increase fines in the fields of construction, housing and real estate
Effective date:: 26-Aug-2026 -
Decree No. 275/2026/NĐ-CP - Increasing the level of sanctions in the field of chemicals and explosives
Effective date:: 25-Aug-2026 -
Decree No. 274/2026/NĐ-CP - New regulations on bidding for business investment projects
Effective date:: 21-Aug-2026 -
Decree No. 330/2026/NĐ-CP - Penalties for violations of cyber security and personal data protection
Effective date:: 19-Aug-2026 -
Decree No. 246/2026/NĐ-CP - Increasing the level of sanctions for violations related to fishery exploitation
Effective date:: 18-Aug-2026 -
Decree No. 323/2026/NĐ-CP - Process of receiving and settling international investment disputes
Effective date:: 17-Aug-2026 -
Decree No. 318/2026/NĐ-CP - Regulations on derivative contracts when opening bankruptcy procedures
Effective date:: 12-Aug-2026 -
Decree No. 219/2026/NĐ-CP - Increasing the fine level for many violations in the field of hydrometeorology
Effective date:: 08-Aug-2026 -
Decree No. 211/2026/NĐ-CP - Increasing fines in the field of animal husbandry
Effective date:: 05-Aug-2026 -
Decree No. 214/2026/NĐ-CP - Increasing the level of sanctions in the field of cultivation and plant quarantine
Effective date:: 05-Aug-2026 -
Decree No. 308/2026/NĐ-CP - Enterprises may set up human resource training funds
Effective date:: 05-Aug-2026 -
Decree No. 204/2026/NĐ-CP - New fines in the field of veterinary medicine (applied from August 1, 2026)
Effective date:: 01-Aug-2026 -
Decree No. 296/2026/NĐ-CP - Amendments to enterprise registration declaration procedures
Effective date:: 23-Jul-2026 -
Decree No. 288/2026/NĐ-CP - Increase in fines for violations related to beneficial owners
Effective date:: 21-Jul-2026 -
Decree No. 186/2026/NĐ-CP - Supplementing sanctioning regulations related to trade names
Effective date:: 15-Jul-2026 -
Circular No. 05/2026/TT-NHNN - Increase the deposit insurance payment limit to VND 350 million
Effective date:: 13-Jul-2026 -
Decree No. 279/2026/NĐ-CP - New powers of the Ministry of Education and Training (applicable from 12/7/2026)
Effective date:: 12-Jul-2026 -
Circular No. 30/2026/TT-BYT - New regulations on inscribing nutritional ingredients on food labels
Effective date:: 10-Jul-2026 -
Decree No. 183/2026/NĐ-CP - Increasing administrative fines in the field of dike protection
Effective date:: 10-Jul-2026 -
Decree No. 208/2026/NĐ-CP - Air transport business conditions as of July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 165/2026/NĐ-CP - New regulations on disease prevention activities
Effective date:: 01-Jul-2026 -
Decree No. 169/2026/NĐ-CP - Aggravating fines in the field of customs and import and export
Effective date:: 01-Jul-2026 -
Circular No. 15/2026/TT-BYT - New regulations on disease prevention activities
Effective date:: 01-Jul-2026 -
Law No. 8/2026/QH16 - Law amending the Law on Vietnam's diplomatic missions abroad
Effective date:: 01-Jul-2026 -
Decree No. 94/2026/NĐ-CP - New regulations on driving license training and exams
Effective date:: 01-Jul-2026 -
Decree No. 253/2026/NĐ-CP - New regulations on PIT declaration and calculation from July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 254/2026/NĐ-CP - New regulations on the use of e-invoices from July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 252/2026/NĐ-CP - New regulations on tax declaration and tax refund
Effective date:: 01-Jul-2026 -
Decree No. 265/2026/NĐ-CP - New sanctioning levels on thrift and anti-waste
Effective date:: 01-Jul-2026 -
Circular No. 27/2026/TT-BNNMT - List of risky products in the agricultural sector
Effective date:: 01-Jul-2026 -
Circular No. 86/2026/TT-BTC - New regulations on tax declaration and payment for imports and exports
Effective date:: 01-Jul-2026 -
Law No. 129/2025/QH15 - Law on Public Employees 2025: Expanding business and practice rights for public employees
Effective date:: 01-Jul-2026 -
Law No. 128/2025/QH15 - Law on Enforcement of Temporary Detention and Detention in 2025
Effective date:: 01-Jul-2026 -
Decree No. 200/2026/NĐ-CP - New regulations on offering corporate bonds (applicable from 5/6/2026)
Effective date:: 05-Jun-2026 -
Circular No. 14/2026/TT-BKHCN - New regulations on assessment and announcement of standard and regulation conformity
Effective date:: 25-May-2026 -
Circular No. 13/2026/TT-BKHCN - New regulations on announcement and application of standards
Effective date:: 24-May-2026 -
Decree No. 114/2026/NĐ-CP - Amendments to the competence to impose administrative penalties in the field of prices
Effective date:: 20-May-2026 -
Decree No. 102/2026/NĐ-CP - Amendments to regulations on sanctions in the field of competition
Effective date:: 20-May-2026 -
Circular No. 22/2026/TT-BNNMT - Many procedures in the field of agriculture and environment are simplified
Effective date:: 19-May-2026 -
Decree No. 98/2026/NĐ-CP - Increasing the level of sanctions in the field of social protection
Effective date:: 16-May-2026 -
Circular No. 05/2026/TT-BYT - List of chemicals banned from use in disinfectant and bactericidal preparations
Effective date:: 15-May-2026 -
Decree No. 81/2026/NĐ-CP - Renewing regulations on administrative sanctions in the field of railway traffic
Effective date:: 15-May-2026 -
Decree No. 86/2026/NĐ-CP - Tightening conditions for trading in prize-winning electronic games
Effective date:: 15-May-2026 -
Decree No. 90/2026/NĐ-CP - New fines in the field of health and pharmacy
Effective date:: 15-May-2026 -
Decree No. 87/2026/NĐ-CP - Increase in fines in the field of advertising and culture
Effective date:: 15-May-2026 -
Decree No. 80/2026/NĐ-CP - Amendments to sanctioning regulations in the field of maritime and waterway traffic
Effective date:: 15-May-2026 -
Decree No. 85/2026/NĐ-CP - New regulations on supplementary pension insurance
Effective date:: 10-May-2026 -
Decree No. 82/2026/NĐ-CP - Amendments to regulations on administrative sanctions related to seas and islands
Effective date:: 04-May-2026 -
Decree No. 79/2026/NĐ-CP - New fines in the field of national border protection
Effective date:: 02-May-2026 -
Decree No. 76/2026/NĐ-CP - Amendments to sanctioning levels for violations related to gender equality
Effective date:: 01-May-2026 -
Decree No. 71/2026/NĐ-CP - Increasing the level of sanctions for violations in the field of atomic energy
Effective date:: 01-May-2026 -
Law No. 111/2025/QH15 - Law on Deposit Insurance 2025 Law No. 06/2012/QH13 - Law of Deposit Insurance
Effective date:: 01-May-2026 -
Decree No. 69/2026/NĐ-CP - Amendments to fine levels and sanctioning competence on fire prevention and fighting
Effective date:: 20-Apr-2026 -
Decree No. 96/2026/NĐ-CP - New regulations on investment conditions and investment incentives
Effective date:: 31-Mar-2026 -
Circular No. 20/2026/TT-BTC - New regulations on conditions for accounting expenses when calculating CIT
Effective date:: 12-Mar-2026 -
Decree No. 31/2026/NĐ-CP - Levels of administrative sanctions in the field of archives
Effective date:: 08-Mar-2026 -
Decree No. 68/2026/NĐ-CP - New tax declaration and payment policy for business households and individuals
Effective date:: 05-Mar-2026 -
Circular No. 18/2026/TT-BTC - Changing the tax calculation method for business households
Effective date:: 05-Mar-2026 -
Law No. 121/2025/QH15 - Law on Supervisory Activities of the National Assembly in 2025
Effective date:: 01-Mar-2026 -
Decree No. 336/2025/NĐ-CP - Many road traffic violations will see increased fines starting March 1, 2026.
Effective date:: 01-Mar-2026 -
Decree No. 357/2025/NĐ-CP - Real estate will be labeled with electronic identification codes from March 1, 2026
Effective date:: 01-Mar-2026 -
Circular No. 47/2025/TT-BNNMT - Announcing the new Regulation on national topographic maps at the scale of 1:10,000
Effective date:: 16-Feb-2026 -
Decree No. 342/2025/NĐ-CP - Tightening regulations on advertising from February 15, 2026
Effective date:: 15-Feb-2026 -
Circular No. 56/2025/TT-BYT - New regulations on occupational disease examination for employees
Effective date:: 15-Feb-2026 -
Decree No. 348/2025/NĐ-CP - Changes in sanctioning authority in the tourism sector from February 15, 2026
Effective date:: 15-Feb-2026 -
Circular No. 136/2025/TT-BTC - Amendments to a number of regulations for securities investment funds
Effective date:: 12-Feb-2026 -
Decree No. 340/2025/NĐ-CP - New fines in the field of currency and banking (applied from 9/2/2026)
Effective date:: 09-Feb-2026 -
Circular No. 121/2025/TT-BTC - Amendments to many important regulations on customs procedures and policies
Effective date:: 01-Feb-2026 -
Circular No. 115/2025/TT-BTC - Amendments to regulations on offering and repurchase of shares
Effective date:: 28-Jan-2026 -
Circular No. 08/2026/TT-BNNMT - New regulations on management of irrigation works
Effective date:: 26-Jan-2026 -
Decree No. 30/2026/NĐ-CP - New regulations on energy labeling on vehicles and equipment
Effective date:: 21-Jan-2026 -
Decree No. 28/2026/NĐ-CP - Renewal of the List of narcotic substances and precursors
Effective date:: 19-Jan-2026 -
Decree No. 24/2026/NĐ-CP - List of basic chemicals and chemicals subject to control (applicable from 17/1/2026)
Effective date:: 17-Jan-2026 -
Decree No. 25/2026/NĐ-CP - New regulations on safety requirements for chemical projects
Effective date:: 17-Jan-2026 -
Decree No. 26/2026/NĐ-CP - New regulations on conditions for production, trading and use of chemicals
Effective date:: 17-Jan-2026 -
Circular No. 01/2026/TT-BCT - Renewal of chemical licensing and declaration processes, forms
Effective date:: 17-Jan-2026 -
Decree No. 310/2025/NĐ-CP - Amending many regulations on administrative sanctions in the field of tax and invoices
Effective date:: 16-Jan-2026 -
Decree No. 19/2026/NĐ-CP - New regulations on appraisal and supervision of projects of national importance
Effective date:: 14-Jan-2026 -
Circular No. 03/2026/TT-BNNMT - List of seafood and aquatic products subject to compulsory quarantine from 13/1/2026
Effective date:: 13-Jan-2026 -
Decree No. 306/2025/NĐ-CP - Supplementing and increasing penalties for many violations in securities trading
Effective date:: 09-Jan-2026 -
Decree No. 292/2025/NĐ-CP - Cases of agricultural land use tax exemption extended until the end of 2030
Effective date:: 01-Jan-2026 -
Decree No. 316/2025/NĐ-CP - New regulations on investment and construction of nuclear power plants
Effective date:: 01-Jan-2026 -
Decree No. 318/2025/NĐ-CP - New regulations on registration of employee information
Effective date:: 01-Jan-2026 -
Circular No. 99/2025/TT-BTC - Replacing the Enterprise Accounting Regime, effective from January 1, 2026
Effective date:: 01-Jan-2026 -
Circular No. 101/2025/TT-BTC - Renewing the special accounting regime for insurance brokerage enterprises
Effective date:: 01-Jan-2026 -
Circular No. 28/2025/TT-BKHCN - Standard information format on digital signature certificates
Effective date:: 01-Jan-2026 -
Decree No. 337/2025/NĐ-CP - Conditions for concluding electronic labor contracts
Effective date:: 01-Jan-2026 -
Resolution No. 111/2025/UBTVQH15 - Criteria for urban classification from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 332/2025/NĐ-CP - Regulations on the framework of radiation safety control and assurance
Effective date:: 01-Jan-2026 -
Decree No. 360/2025/NĐ-CP - New regulations on excise tax from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 2/2026/NĐ-CP - Increasing the fine level for violations in the field of charges and fees
Effective date:: 01-Jan-2026 -
Decree No. 352/2025/NĐ-CP - Conditions for employment service business as of January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 362/2025/NĐ-CP - Officially abolishing the license fee from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 366/2025/NĐ-CP - New regulations on the establishment of state-contributed enterprises
Effective date:: 01-Jan-2026 -
Decree No. 356/2025/NĐ-CP - New regulations on personal data protection and transfer
Effective date:: 01-Jan-2026 -
Law No. 77/2025/QH15 - Amended Law on Economical Use of Energy (applicable from 2026)
Effective date:: 01-Jan-2026 -
Law No. 74/2025/QH15 - Employment Law 2025: Expanding the eligibility for unemployment insurance contributions
Effective date:: 01-Jan-2026 -
Law No. 150/2025/QH15 - Specialized Court Law at the International Financial Center
Effective date:: 01-Jan-2026 -
Decree No. 364/2025/NĐ-CP - Road toll collection and exemption policy from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 374/2025/NĐ-CP - New regulations on unemployment insurance (applicable from January 1, 2026)
Effective date:: 01-Jan-2026 -
Decree No. 353/2025/NĐ-CP - Conditions for testing new digital technology products and services
Effective date:: 01-Jan-2026 -
Circular No. 01/2026/TT-BNNMT - New regulations on quarantine of animal products from 2026
Effective date:: 01-Jan-2026 -
Decree No. 371/2025/NĐ-CP - Officially sanctioning the act of using e-cigarettes from 31/12/2025
Effective date:: 31-Dec-2025 -
Decree No. 290/2025/NĐ-CP - Increasing administrative penalties in the field of water resources
Effective date:: 25-Dec-2025 -
Circular No. 41/2025/TT-BYT - Renewing professional standards for doctors and nurses
Effective date:: 18-Dec-2025 -
Circular No. 102/2025/TT-BTC - Amending some financial safety indicators for securities companies
Effective date:: 15-Dec-2025 -
Decree No. 282/2025/NĐ-CP - Increasing administrative penalties in the field of security and order
Effective date:: 15-Dec-2025 -
Decree No. 313/2025/NĐ-CP - New regulations on receipt and use of foreign aid capital
Effective date:: 08-Dec-2025 -
Circular No. 28/2025/TT-BXD - Economic and technical characteristics of ship inspection services
Effective date:: 01-Dec-2025 -
Circular No. 29/2025/TT-BXD - Economic and technical characteristics of ship inspection services
Effective date:: 01-Dec-2025 -
Circular No. 36/2025/TT-BKHCN - Framework regulations on appraisal and performance of science-technology contracts
Effective date:: 26-Nov-2025 -
Circular No. 16/2025/TT-BNV - Service contract and labor contract templates applicable to state agencies and units
Effective date:: 16-Nov-2025 -
Decree No. 273/2025/NĐ-CP - New regulations on inspection activities in the People's Public Security
Effective date:: 20-Oct-2025 -
Decree No. 236/2025/NĐ-CP - Regulations on global minimum tax declaration and payment from fiscal year 2024
Effective date:: 15-Oct-2025 -
Decree No. 265/2025/NĐ-CP - New regulations on the use of Science and Technology Development Fund of enterprises
Effective date:: 14-Oct-2025 -
Decree No. 269/2025/NĐ-CP - Framework regulations on investment in smart urban development
Effective date:: 14-Oct-2025 -
Circular No. 34/2025/TT-NHNN - New regulations on gold trading (effective from October 10, 2025)
Effective date:: 10-Oct-2025 -
Decree No. 259/2025/NĐ-CP - Framework regulations on import and export of strategic commercial goods
Effective date:: 10-Oct-2025 -
Decree No. 258/2025/NĐ-CP - New regulations on management of parks, trees and water surfaces
Effective date:: 09-Oct-2025 -
Law No. 93/2025/QH15 - Law on Science, Technology and Innovation (2025)
Effective date:: 01-Oct-2025 -
Decree No. 249/2025/NĐ-CP - Remuneration mechanism for experts in science and technology projects
Effective date:: 19-Sep-2025 -
Decree No. 205/2025/NĐ-CP - Supplementing many preferential policies for the supporting industry sector
Effective date:: 01-Sep-2025 -
Decree No. 228/2025/NĐ-CP - Regulations on new penalties in the field of independent audit
Effective date:: 18-Aug-2025 -
Decree No. 167/2025/NĐ-CP - Amending many regulations on customs declaration procedures
Effective date:: 15-Aug-2025 -
Decree No. 218/2025/NĐ-CP - Sanctions from August 5, 2025 in the field of defense and cipher
Effective date:: 05-Aug-2025 -
Law No. 68/2025/QH15 - Law on Investment of State Capital in Enterprises in 2025
Effective date:: 01-Aug-2025 -
Decree No. 135/2025/NĐ-CP - Mechanism for evaluating the performance of banks with 100% capital held by the State
Effective date:: 01-Aug-2025 -
Decree No. 113/2025/NĐ-CP - Framework regulations on the development and updating of archival data
Effective date:: 21-Jul-2025 -
Decree No. 204/2025/NĐ-CP - Procedures for advance and payment of procedural expenses from July 11, 2025
Effective date:: 11-Jul-2025 -
Decree No. 186/2025/NĐ-CP - New regulations on procurement and use of public assets
Effective date:: 01-Jul-2025 -
Circular No. 12/2025/TT-BXD - New regulations on tonnage and loading limits on vehicles
Effective date:: 01-Jul-2025 -
Decree No. 165/2025/NĐ-CP - Regulation on data management, processing and use
Effective date:: 01-Jul-2025 -
Circular No. 12/2025/TT-BNV - New regulations on sickness, maternity, and retirement benefits from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 181/2025/NĐ-CP - New regulations on VAT declaration and deduction apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Circular No. 69/2025/TT-BTC - New guidance on VAT calculation rates and how to determine the refundable VAT amount
Effective date:: 01-Jul-2025 -
Decree No. 178/2025/NĐ-CP - New regulations on the formulation of types of planning
Effective date:: 01-Jul-2025 -
Decree No. 118/2025/NĐ-CP - Framework regulations on settlement of administrative procedures apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 127/2025/NĐ-CP - Regulation on decentralization of authority to manage public assets from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 151/2025/NĐ-CP - Regulation on decentralization of land management from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 158/2025/NĐ-CP - New regulations on compulsory social insurance payment (applied from July 1, 2025)
Effective date:: 01-Jul-2025 -
Decree No. 155/2025/NĐ-CP - Norms for the use of working offices of State agencies apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Circular No. 09/2025/TT-BTP - New powers of the Department of Justice from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 86/2025/NĐ-CP - New regulations on application of trade remedies
Effective date:: 01-Jul-2025 -
Decree No. 105/2025/NĐ-CP - New regulations on fire prevention and fighting, applied from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 106/2025/NĐ-CP - Acts and fines in the field of fire prevention and fighting apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Law No. 51/2024/QH15 - Law on amendments to the Law on Health insurance, applicable from July 01, 2025
Effective date:: 01-Jul-2025 -
Decree No. 150/2025/NĐ-CP - List of Departments and Departments in the provinces applicable from 16/6/2025
Effective date:: 16-Jun-2025 -
Circular No. 01/2025/TT-NHNN - Procedures for granting operation licenses to people's credit funds
Effective date:: 15-Jun-2025 -
Decree No. 77/2025/NĐ-CP - New regulations on nationalization of certain types of property
Effective date:: 01-Apr-2025 -
Decree No. 80/2025/NĐ-CP - New regulations on implementation of legal normative documents
Effective date:: 01-Apr-2025 -
Circular No. 29/2024/TT-BGDĐT - New regulations on provision of extra classes from February 14, 2025
Effective date:: 14-Feb-2025 -
Decree No. 15/2025/NĐ-CP - New regulations on management and operation of railway infrastructure property
Effective date:: 03-Feb-2025 -
Circular No. 12/2025/TT-BCT - New regulations on determining electricity price and model power purchase agreement
Effective date:: 01-Feb-2025 -
Law No. 58/2024/QH15 - 2024 Law on Public Investment Law No. 39/2019/QH14 - 2019 Law on Public Investment
Effective date:: 01-Jan-2025 -
Decree No. 162/2024/NĐ-CP - New requirements for founding shareholders and founding members of banks
Effective date:: 20-Dec-2024 -
Law No. 47/2024/QH15 - 2024 Law on Urban and Rural Planning Law No. 30/2009/QH12 - Law on urban planning (2009)
Effective date:: 01-Jul-2025 -
Law No. 38/2024/QH15 - 2024 Law on National Defense and Security Industry and Industrial Mobilization
Effective date:: 01-Jul-2025 -
Law No. 33/2024/QH15 - 2024 Law on Achieves Law No. 01/2011/QH13 - Law on archives
Effective date:: 01-Jul-2025 -
Law No. 42/2024/QH15 - 2024 Law on management and use of weapons, explosive materials and support instruments
Effective date:: 01-Jan-2025 -
Law No. 35/2024/QH15 - 2024 Law on Road Law No. 23/2008/QH12 - Road Traffic Law 2009
Effective date:: 01-Jan-2025 -
Decree No. 141/2024/NĐ-CP - Occupations that require mandatory HIV testing before recruitment
Effective date:: 15-Dec-2024 -
Circular No. 19/2024/TT-BYT - List of new HS codes of imported, exported medical equipment
Effective date:: 16-Nov-2024 -
Decree No. 123/2024/NĐ-CP - Fines for violations in the field of land apply from 4/10/2024
Effective date:: 04-Oct-2024 -
Circular No. 36/2024/TT-NHNN - Guidelines on classification of debts with regard to cooperative banks
Effective date:: 15-Aug-2024 -
Circular No. 14/2024/TT-NHNN - Criteria for classification of nonperforming loans at microfinance institutions
Effective date:: 12-Aug-2024 -
Decree No. 60/2024/NĐ-CP - Regulations on development and management of markets
Effective date:: 01-Aug-2024 -
Decree No. 104/2024/NĐ-CP - Cases eligible for capital advance from the Land Development Fund from August 1, 2024
Effective date:: 01-Aug-2024 -
Circular No. 40/2024/TT-NHNN - Conditions for provision of payment intermediary services from July 17, 2024
Effective date:: 17-Jul-2024 -
Decree No. 87/2024/NĐ-CP - New sanctions in the field of prices, applied from 12/7/2024
Effective date:: 12-Jul-2024 -
Decree No. 69/2024/NĐ-CP - New regulations on issuance of electronic identification and authentication
Effective date:: 01-Jul-2024 -
Circular No. 18/2024/TT-NHNN - From July 01, 2024: It is allowable to issue electronic bank cards
Effective date:: 01-Jul-2024 -
Circular No. 31/2024/TT-NHNN - New regulations on classification of debts of banks, finance companies
Effective date:: 01-Jul-2024 -
Decree No. 52/2024/NĐ-CP - Payment forms to be considered cashless payments from July 01, 2024
Effective date:: 01-Jul-2024 -
Law No. 26/2023/QH15 - 2023 Law on Identification Law No. 59/2014/QH13 - Law on Citizen identification
Effective date:: 01-Jul-2024 -
Law No. 28/2023/QH15 - 2023 Law on Water Resources Law No. 17/2012/QH13 - 2012 Law on Water resources
Effective date:: 01-Jul-2024 -
Law No. 24/2023/QH15 - 2023 Law on Telecommunications Law No. 41/2009/QH12 - 2019 Law on Telecommunications
Effective date:: 01-Jul-2024 -
Law No. 16/2023/QH15 - 2023 Law on Prices Law No. 11/2012/QH13 - 2012 Law on Prices
Effective date:: 01-Jul-2024 -
Law No. 17/2023/QH15 - 2023 Law on Cooperative Law No. 23/2012/QH13 - Foreigners may become members of cooperatives
Effective date:: 01-Jul-2024 -
Circular No. 71/2023/TT-BCA - Environmental Police Wastewater Inspection Process
Effective date:: 01-Feb-2024 -
Law No. 22/2023/QH15 - 2023 Law on Bidding Law No. 43/2013/QH13 - Law on Bidding (2014)
Effective date:: 01-Jan-2024 -
Resolution No. 107/2023/QH15 - Regulations on payment of global minimum tax in Vietnam
Effective date:: 01-Jan-2024 -
Decree No. 96/2023/NĐ-CP - Regulations on issuance of license to practice medicine applicable from 2024
Effective date:: 01-Jan-2024 -
Law No. 06/2022/QH15 - 2022 Law on emulation and Commendation of Vietnam
Effective date:: 01-Jan-2024 -
Decree No. 74/2023/NĐ-CP - Amendments to some Decrees on activities in the maritime sector
Effective date:: 27-Nov-2023 -
Circular No. 17/2023/TT-BGDĐT - New Regulation on Exams for the Selection of Excellent Student at National Level
Effective date:: 25-Nov-2023 -
Decree No. 17/2023/NĐ-CP - Regulations on copyright, applicable from April 26th, 2023
Effective date:: 26-Apr-2023 -
Circular No. 25/2022/TT-BLĐTBXH - List of personal protective equipment must be provided for employees
Effective date:: 01-Apr-2023 -
Decree No. 35/2022/NĐ-CP - New regulations on establishment of industrial parks and economic zones
Effective date:: 15-Jul-2022
