VNENSign in

stop-check Administrative penalty in construction field. English attachment

Circular No. 24/2009/TT-BXD dated July 22, 2009, of the Ministry of Construction detailing a number of provisions of the Government’s Decree No. 23/2009/ND-CP⛔ of February 27, 2009, on sanctioning of administrative violations in construction activities; real estate business; exploitation, production and trading of construction materials; management of technical infrastructure facilities; and management of development of houses and offices
Posted: 27/9/2011 9:38:00 AM | Latest updated: 20/2/2014 9:38:05 AM (GMT+7) | Newsletter #:2296
Effective: 9-Sep-2009 Status: Expired on: 2-Apr-2014
LuatVietnam Construction works contrary to the construction permits is the works breaching of one of the contents within the construction permits, including: changing construction place; wrong foundation; breaching red-lined boundaries. If construction works are civil and industrial projects and separate dwelling-house, the breaches are included: wrong area; exceeding limit height, number of floor and breaching management of architecture. Works are considered to have wrong design if falling into one of the following cases: changing main weight-bearing structure, architecture of vertical planes; exceeding maximum height; changing usage purpose and wrong construction density, wrong coefficient of land using.
After the issuance of execution suspension decision, if investors and contractors repeatedly commit an offence, they shall be punished a fine depending on level of breach, scale of works as below: (i) VND500 million if the works is required to formulate the investment construction project; (ii) VND300 million if the works is not required to formulate projects and be revoked construction permits (if any).
This Circular also regulates in detail the cases of revocation of the right to use construction permits. A practicing certificate granted to an individual whose operation exceeding his/her practicing capacity conditions or having his/her operation exceeding the scope of practicing certificate for the works can be revoked for an unlimited period.
The right of trading real estate can be revoked for an unlimited period in following violations which have been committed more than three times: (i) sale, lease, hire purchase of real estate without via a real estate trading floor in case such transaction needed via a real estate trading floor under the law; (ii) sale, lease, hire purchase of real estate at a real estate trading floor not comply with order and procedure; and (iii) not confirm or wrongly confirm on real estate transacted on a real estate trading floor; etc.
This Circular takes effect from September 09, 2009 and replaced Circular No. 01/2005/TT-BXD⛔ dated January 31, 2005
 
Effective notes
This Circular shall be expired from April 02, 2014, replaced by Circular No. 02/2014/TT-BXD⛔ of February 12, 2014.

Related document

Please sign in or register an account to view this information

Files attachment

New message from Admin